Instructions / Assembly

Installation & Assembly Instructions
Please contact our Customer Service Division with any questions at:
30700 D Carter Street ∙ Solon, OH 44139 ∙ (P) 440.248.5480 ∙ support@tritonproducts.com
For a full line of products visit www.tritonproducts.com 1 INDH800
Read all instructions completely before installing. Should you have any questions about your installation, please call
Customer Service at 440-248-5480
Tools needed for this installation (not supplied with kit): Drill, Phillips Screw Driver, Tape Measure, and Level
Parts Listing
Part Number Quantity Description
990 2 Polypropylene Pegboard 18” x 22” x 1/8” thick
24 Assortment DuraHook Locking Pegboard Hooks
32 Lock Screws for hooks (packaged separately)
2 Hanging Plastic Bins
2 BinClips for Hanging Plastic Bins
18 #12-2” long wood screws
18 #12 plastic wall anchors
18 Metal wall mounts/spacers
1. Wall Mounting Instructions: Polypropylene pegboards can be mounted to walls in separate locations, side by side
horizontally or above one another vertically.
A) Determine the location or locations where you want to mount your new storage system.
B) Determine if you want to mount boards (a) side by side horizontally, (b) above or below one another, or (c) in a
different location.
C) Using one sheet of the Polypropylene Pegboard (DuraBoard®) determine the location and height you wish to
mount your VersaStor storage system.
D) (Using diagram 1-1) Hold one sheet of pegboard flat against the wall surface, use level to make sure board is
level and square.
E) (Using diagram 1-1) While still holding pegboard flat against wall level and using a pencil, make a circular trace
inside of all (9) hole locations using diagram 1-1. (If planning to mount boards in totally separate locations go to
step (H)
F) If youre planning to mount the second pegboard directly to the side or above or below the first: Hold the first
pegboard flat against the wall while making sure all 9 traced holes are still aligned with appropriate holes in
pegboard. Using a pencil, trace the outer edge of the board you’re planning to mount the second board against.
G) If mounting side by side or above or below one another: use the second board in your kit, align outer edge with
pencil mark created in step (F). Do not cover up pencil mark with board. Mark hole locations as listed in step
(E).
H) Using an electric drill with 5/16" drill bit, drill hole locations marked in step (E). Should any hole location fall in
line with a wood wall stud, it will not be necessary to pre-drill.
990 VersaCenter/VersaStor Wall Organizer

Summary of content (2 pages)