Storage Shed OWNER’S MANUAL / Instructions for Assembly Patent #416.091 Size 8’ x 6’ Ver: 2.0 Customer Service Hotline (800) 483-4674 www.uspolymersinc.com Your Total Solution To maintenance Free Storage Sheds. • All Weather Durable PVC • Won’t Dent, Rust, Rot or Mildew • Never Needs Painting • 61” Wide Double Doors • Easy Assembly • High Wind Tested • Snow Load Tested 20lbs/sq.
Parts List Note: Check all parts prior to installation.
8’ x 6’ Exploded View RRS RRS RP RP RP RP FPLB FPRB RS5B RS10B RS2B RS2B RS4XB RS11B RS4XB RS5 RS5 RS3B RS10B RS2B RS12B RS5B RS1XB MJ RS2B RS3B CMB RS1XB RS8B FPRB FPLB CMB MJ DSH RS9B CB3B CMB CCB CB3XB CB2B B22 CCB B2B B21 CCB CB1B CMB B2B CB2B CCB B1LB B1RB CB1B CB1B CB4B CB4B CDRB CDLB FSP FSP DL DR
Duramax Storage Shed Limited Fifteen Year Warranty U.S. Polymer Inc. will send a replacement part free of charge, in the event of material defects and or workmanship for a period of fifteen years from the date of purchase. This warranty is extended only to the original purchaser. A purchase receipt or other proof of date of original purchase will be required before warranty service is rendered. In no event shall we pay the cost of flooring, labor, installation or any other costs related thereto.
A. Foundation & Base Frame DuraMax must be installed on a level wooden platform or a level concrete foundation. Wooden platform is extra and is not included. Don’t install under windy conditions. Note Parts needed: (1) U channel Front left (B1LB) (1) U channel Front right (B1RB) (1) U channel Back (B21) (1) U channel back (B22) (2) U channel Side (B2B) (22) Dia. 4.2 x 16mm Screws (S1) 1.
4. Using a carpenters square, line up all corners. Secure base to wood foundation using (S1) screws B22 Concrete foundation 4b. Shed or shed foundation should be placed on concrete footing by use of anchor bolt and nut. Using a carpenters square, line up corners. Align U-Channel base, mark the concrete through the holes in the base and drill concrete with 1/2” (dia. 12.5mm) concrete bit to accept anchor bolts to a 1 3/4” (44mm) depth. Replace base and secure with 1/4” x 1 1/2” (M6 x 40mm) anchor bolts.
2. Insert the front side panel (FSP ) into the groove of column (CDRB). Start at the bottom of the panel at an angle then push into place. Note Always place panels into frame at an angle on top and slide in sideways and downward for easy insertion. CDRB FSP FSP Note Make sure panels are right side up with panel shingles facing down. Check the stamped label on top. of all panels. CDR FSP CDRB B1RB Inside 3. Slide corner column (CCB) into side panel (FSP ) pushing the column to the side panel.
5.To stabilize the front panel attach the front center 1&2 band right (CB1B). Start with the center band fitting. Fix to corner column (CCB) with (S2) screws. To continue See figures (fig.1) (fig.2) and (fig.3). Tip To insure easy assembly Locate the identification number of each part. 3 CB1B CCB FSP CDRB CB1B Inside CCB S1 CDRB S1 FCB FCB CB1B CB1B S2 CCB Fig.1: Use (S2) screw. Fix (FCB) to (CCB). Leave it loose. 6.
7. Working from inside, continue connecting the 2 side panels (SP ) and column (CMB) in sequence along (B2B) base to corner column (CCB). Use (S1) screws to fix columns to base. CCB SP SP CCB SP CMB CCB CMB B22 B2B B2B B2B S1 Inside S1 8. Stabilize the side panels with center band (CB2B). Start with the center band fitting (FCB). Fix to corner column (CCB) with (S2) screws. See figures (fig.1) (fig.2) (fig.3) and (fig.4).
9. Assemble back center bands (CB3B) and (CB3XB) with middle joining support (MJ). Use (S1) screws. CB3B CB3XB CB3B S1 MJ MJ CB3XB 10. Continue connecting the back panels and columns CCB in sequence along base (B22) and (B21). Fix columns to base with (S1) screws. Note For installation of window follow the Window Kit Installation manual at this point. CMB SP CMB CMB SP SP S1 B21 B22 Back Wall 11. Fix the corner column (CCB) to last panel and base.
12. Working from outside, use (S1) screws to secure the corner column (CCB) to bases (B21) and (B2B) SP CCB B2B B21 Outside S1 13. Stabilize side panels with center bands (CB3B & CB3XB). Fix the center band fitting (FCB) to corner column (CCB). See figure 1. Follow figures 2,3 ,4, 5 and 6. CCB CMB 1&5 CB3B CB3XB 4 CB3B CB3XB B21 Back Wall CMB S1 CCB 2 3&6 CB3B B22 CMB FCB CB3XB FCB S2 CB2B CB3B CB1A Fig.1: Use (S2) screws. Fix (FCB) to (CCB). Leave it loose. CB3XB Fig.
14. Working from inside continue connecting the 2 side panels (SP ) and columns (CMB) in sequence along (B2B) base. Use (S1) screws to fix columns to base. CCB CMB SP SP CMB S1 B2B Inside 15. Slide corner column (CCB) into the side panel (SP ) pushing the column into position. SP CCB CCB Inside 16. Working from outside use (S1) screws to secure the corner column (CCB) to bases (B2B) and (B1LB).
17. Stabilize the side panels with center band (CB2B). Fix (FCB) to column (CCB) See (fig.1) (fig.2) (fig.3) and (fig.4) for details. CCB CCB CMB 1&4 2 3 CB2B Inside CCB S1 S1 FCB CB2B FCB S2 CB2B CB3XB CB1A Fig.1: Use (S2) screw. Fix (FCB) to (CCB). Leave it loose. 9 Fig.2: Use (S1) screws. Fix (CB2B) to (FCB) and (CB3XB). S1 CMB Fig.3: Use (S1) screws. Fix (CB2B) to (CMB) column. FCB CB2B Fig.4: Use (S1) screw. Fix (CB2B) to (FCB).
18. Insert the side panel (FSP ) into the groove of column (CCB). Start at the bottom with panel at an angle then push into place. SP CCB FSP CCB FSP B1LB B1LB Inside 19. Slide door column (CDLB) into the U-Channel Base (B1LB) on the left side of the door. Line up the pre-drilled holes on (CDLB) Column with predrilled holes on U-Channel Base (B1LB). Secure with two (S1) screws from the inside. (see blowup detail). CCB CDLB FSP CDLB CDLB B1LB B1LB S1 20.
21. Fix center band (CB4B) to (CDLB) and base (B1LB). See Fig. 1, 2 and 3. CCB CDLB 1 3 CB1B CB4B CB1B S1 CB4B EPS CDLB B1LB CB1B EPS CB4B CDLB S1 Fig.1: Use (S1) screw. Fix (CB4B) to (CDLB) Fig.2: Use (S1) screw. Fix (CB4B) to base (B1LB) CB4B Fig.3: Fix the (EPS) 2 at the end of (CB1B) & (CB4B). B1LB Inside 22. Make sure the door opening between the door columns (CDLB) and (CDRB) is 61 1/4” (1556mm). This will ensure a perfect fit for the doors.
1. Insert the middle column fitting (FMC) into top of the middle columns (CMB). Fix the column to fittings with (S1) screws from inside the shed. FMC FMC CMB FMC CMB CMB FMC FMC CMB S1 CMB Inside CMB Inside FCC 2. Insert the corner column fittings (FCC) into the corner columns (CCB). Fix with (S1) screws from out side of the shed. FCC FCC CCB FCC CCB FCC FCC CCB CCB CCB CCB S1 3. Insert the door column fittings (FDCL) and (FDCR) left and right into the door columns (CDLB) and (CDRB).
13 RS1XB RS2B RS3B RS4XB MJ RS5 RS10B RS1XB RS2B RS11B RS5B RS12B RS5B RS9B DSH RS10B RS1XB RS2B MJ RS8B RS4XB RS9B RS3B ROOF STRUCTURE EXPLODED VIEW RS2B RS1XB
Front roof structure assembly 4. Assemble front roof structures (RS1XB) 2nos. and middle joining support (MJ) together with 4 (S1) screws as shown in fig. RS1XB MJ RS1XB RS1XB S1 RS1XB 5. Assemble roof structure support (RS8B) and (RS9B) to (RS1XB) assembly with only 4 (S1) screws. U- Ch n an el Op e g nin U- Ch a U- Ch an Op en lO pe ing RS9B S1 These holes up RS1XB Step 1 6. Assemble roof structure (RS2B) to (RS8B) S1 RS2B and (RS9B) with 8 (S1) screws.
Back roof structure assembly 7. Assemble back roof structures (RS1XB) 2 nos. and middle joining support (MJ) together with 4 (S1) screws . RS1XB MJ RS1XB RS1XB S1 RS1XB 8. Assemble roof structure support (RS8B) U and (RS9B) to (RS1XB) assembly with 8 (S1) screws. U- a Ch nn el Op e h -C an l ne Op en ing g nin RS8B RS1XB U- Ch an l ne Op en ing S1 RS9B These holes up RS1XB Step 1 9. Assemble roof structure (RS2B) to (RS8B) and (RS9B) with 8 (S1) screws.
10. Place the assembled front roof structure into position on top of door columns. Line up pre-drilled holes with door column fittings (FDCL) & (FDCR). Use (S1) screws to fix front roof structure to the door columns with left and right door fittings. Front Inside Of Shed FDCR FDCL CDRB CDLB 11. Fix the door stopper horizontal (DSH) to the front roof structure from inside with 8 (S1) screws. Position the latch hole to face down. DSH U-channel opening inside the shed.
12. Place the assembled back roof structure into position on top of columns (CMB). Line up pre-drilled holes with column fittings (FMC). Use (S1) screws to fix back roof structure to (FMC). Inside Back of Shed FMC FMC FMC FMC CMB CMB CMB CMB 2 Note Make sure front and back assembly, the (RS2B ) roof structure position towards inside the shed as shown in Fig.1 & Fig.2 1 RS2B RS2B RS2B Fig.1 17 RS2B Fig.
13. Insert 90 degree joint (RJ) into the (RS3B) U-channel Roof support. Use a hammer to push in. Repeat on both ends of (RS3B). Fix (RJ) to (RS3B) with (S1) screws (2 sets). RS3B RJ Note RS3B RS3B RJ After assembly make sure (RS3B) roof structure’s U-Channel is positioned down. RS3B 14. Insert the 90 degree joint (RJ) (assembled with roof structure RS3B) into the roof structures (RS1XB) . See (fig.1) Follow Fig. 2 and 3. Note RS3B Notice the U-channel up position on roof structures (RS1XB).
15. Fix the (RS3B) to middle column fitting (FMC) with (S1) screws. FMC CMB 16. Place the roof structure (RS5B) into position on roof structure supports (RS8B). Use (S1) screws to fix (RS5B) to (RS8B). See (fig.1) and (fig. 2). RS5B RS5B 2 RS5B RS5B 1 RS5B RS5B RS2B RS2B RS5B RS8B S1 Front Inside 19 RS5B fig.1 S1 RS8B RS8B Back Inside fig.
17. Attach the roof structures (RS5B) to (RS9B) with (S1) screws. See fig.1, 2, 3 and 4. 3 4 RS5B RS5B RS5B RS5B 2 1 RS2B RS2B RS5B BRS5B 5SR S1RS5B FRONT FRONT S1 RS9B RS9B fig.1 fig.2 RS2B RS2B BRS5B 5SR RS5B RS5B BACK S1 RS9B fig.3 20 S1 BACK RS9B fig.
18. Attach the roof structures (RS4XB) to (RS3B) with (S1) screws. See fig.1 & 3. RS3B 18a. Attach the roof structures (RS4XB) to (RS5B) RS4XB 1 4 with (S7) screws. See fig.2 & 4. 2 RS4XB 4 RS3B 3 RS4XB RS4XB RS5B S1 S1 RS7XA RS4XB RS4XB RS5B RS4XB RS4XB RS4XA RS3B S7 fig.1 RS5B RS7A RS4XB S7 fig.4 21 fig.2 S7 RS3B fig.
3 19. Attach roof structure support (RS10B) and (RS11B) to roof structures (RS5B) using (S1) screws. See (fig.1), (fig.2) and (fig.3). RS11B RS10B RS10B 2 RS11B RS10B Note RS10B 1 Make sure the hole in (RS10B) face outward on both sides. RS10B RS5B RS5B S1 RS10B RS8B RS5B RS5B RS11B RS5B RS5B RS8B RS8B RS10B S1 S1 Inside Back Inside Front fig.1 22 fig.2 fig.
20. Attach the roof structures support (RS12B) with (RS5A) and (RS5A) with (S1) screws. See fig.1 and 2. RS12B RS5B RS12B RS5B RS4XB RS4XB RS5B RS12B S1 fig.1 23 RS5B RS12B S1 fig.
D. Roof panels Parts Needed: (4) Roof Panels (2) Facia Panel Left (2) Facia Panel Right (2) Ridge Cover (64) Roof Plugs w/Washer (64) Roof Pins (8) Sagging Support (RP ) (FPLB) (FPRB) (RRS) (PPG) (PIN) (RS14B) 1. Place facia panel (FPRB) to front roof structure right side. Front 2. Line up the holes with roof structure and fix the roof plugs w/washers. Use a hammer to drive in plastic pins (rubber mallet).See figures 1, 2 & 3 for details.
3. Start attaching the roof panels from (FPLB) corner side by sliding the roof panel (RP ) on roof structure. Locate the hole positions of the roof panel and roof structure. Fix with plastic washers and plugs. Use a hammer to drive in plastic pins. See figures 1 thru 4. Attaching the ridge cover (RRS) on top of the roof panels (RP ), start from the front side of the shed. Note Use a screw driver to align the holes. Insert roof plugs into roof panels only as indicated.
4. Insert the sagging support (RS14B) from inside the shed by sliding in between roof structure (RS5) and roof panel until it reaches (RS3) roof structure for each panel. See figures. 5. Insert the sagging support (RS14B) from inside the shed by sliding in between roof structure (RS5) and roof panel until it touches the other roof structure (RS5). See figures. RS14B RS14B RS5 RS3 Outside View Inside View E. Doors Parts Needed: (1) Door Left (1) Door Right 1.
Note: To prevent water leakage it is important that these instructions are followed. 1. After completing the assembly apply silicone around the perimeter of the base U-channel. Seal the corners, joints and base of door column also. 4 Inside Base U-channel 2. After completing the panel assembly, apply silicone around the roof plugs. This is optional and should be done for heavy rain areas if needed.
F. Optional Ventilation Kit ACCESSORIES CODE DESCRIPTION VC VCP VENTILATION COVER VENTILATION COVER PIN QTY 2 4 VENTILATION COVER (VC) VENTILATION COVER PIN (VCP) TOOLS YOU WILL NEED Power Drill Dia 5/32” (4.2mm) drill bit Dia 1/2” (12.5mm) drill bit VC Optional ventilation kits can be installed on any of the wall panels. However, we recomend mounting them on the top of the shed’s back wall. 1. Place the ventilation cover (VC) as shown in fig.1. Using a pencil, mark the two side hole locations.
High wind area installation instructions Note: To ensure that your shed withstands high winds, you will need the following reinforcement. Parts needed: CODE DESCRIPTION S4 DIA. 4.2 x 16mm. (5/32” x 5/8”) SHEET METAL SCREW M6 x 40mm. (1/4” x 1 1/2”) Anchor bolt with nut S5 QTY 36 (not included with shed) 22 (not included with shed) 1. Shed or shed foundation should be placed on concrete footing by use of anchor bolt and nut. Using a carpenters square, line up corners.
3. Attach each side panel (SP ) on top to the roof structure (RS1) and (RS3). Using a dia. 3mm (1/8”) drill with a power drill, make two equal distance holes on the side panel through the roof structure. Drive a self tapping screw (S4) through the side panel to the roof structure. Repeat this for every side panel. See blowup.