Installation Guide
2. After comletin te anel assembly, aly
silicone arond te roof ls. is is otional
and sold be done for eavy rain areas if
needed.
1. After comletin te assembly aly silicone
arond te erimeter of te base U-cannel.
Seal te corners, oints and base of door colmn
also.
Base -channel