Instructions / Assembly
6
IMPORTANT : USE HAND GLOVES TO PREVENT INJURY.
Note
After assemble the Base āUā Channel
it can be filled with concrete up to
the Foundation level.
Concrete
The Plywood can be placed by this
sizes inside the base āUā Channel.
(plywood not Included)
Option - 1
Option - 2
The Plywood should be placed
after completing the Wall Panel
Assembly.
11
12










