Instructions / Assembly

6
IMPORTANT : USE HAND GLOVES TO PREVENT INJURY.
Note
After assemble the Base ā€˜U’ Channel
it can be filled with concrete up to
the Foundation level.
Concrete
The Plywood can be placed by this
sizes inside the base ā€˜U’ Channel.
(plywood not Included)
Option - 1
Option - 2
The Plywood should be placed
after completing the Wall Panel
Assembly.
11
12