Use and Care Manual

A. Foundation & Base Frame
Note: It is important that these instructions
are followed step by step.
1
(2) Foundation ‘U’ Channel (FC1AP)
(2) Foundation ‘U’ Channel (FC2AP)
(2) Foundation ‘U’ Channel (FC3AP)
(2) Foundation ‘U’ Channel (FC4AP)
(4) Foundation ‘U’ Channel (FCCP)
(1) Base bar back left  (BLAP)
(1) Base bar back right  (BRAP)
(2) Base bar side  (BS1AP)
(2) Base bar side  (BS2AP)
(2) Base bar front (BBFP)
(1) Entrance taper channel  (ECAP)
(16) Sheet metal screws  (S7)
(72) Sheet metal screws  (S1)
Parts needed:
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
Before Assembling Foundation
make sure that the floor level
should be perfect flat.
Note
1. Assemble the channel (FC1AP) & (FC2AP)
together using (S1) screws. Make 2 sets.
2. Assemble the channel (FC3AP) & (FC4AP)
together using (S1) screws. Make 2 sets.
S1
S1
FC2AP
FC1AP
FC3AP
FC4AP