Installation Guide

Check Box for these Contents
Description Pcs.
1
Post
4
2
Roof Rails
2
3
Side Rails
2
3.1
Side Rails
2
3.2
Side Rails
2
4
Side Pickets
10
5
Lattice
2
5
Rafters
5
6
Post Pyramid Caps
8
7 Rafter Sharp Caps 12
8
Screws Pan Head 93mm
20
9
Screws Pan Head 55mm
12
10 Snap Cap w/ Washer 32
11 Vinyl Glue 1
12 Metal Ground Anchor 4
12
Capistrano Arbor
Footing with Concrete
Insert the 2 x 3½¨ metal ground anchors into the bottom
of the arbor post and secure with screws through the
predrilled holes. (Figure 4.1)
STEP 4: Arbor Footing Installation
If you have a problem or question
Please call 1 800 483 4674
(Mon-Fri • 8:AM to 4:PM PST)
or visit www.duramaxBP.com
DuraMax Building Products, A Division of US Polymers Inc. • 1057 S. Vail Ave. Montebello, CA 90640 • DuraMax © 2009
Tools Required for Assembly
• Cordless Drill • Tape Measure
• Rubber Mallet • Level
• Stool or Ladder • Screw Driver
Move the arbor to its final location (2 people will be needed). Set the
Arbor and mark the positions of the posts, then move the arbor aside
and lay it carefully on it’s side. Dig four holes approximately 6" wide x
18" deep. (Figure 4.2b)
Now move the arbor back into position. Support the arbor plumb and
level over the holes using blocks of wood, bricks, or stones under the
bottom rail of the side panel. (Figure 4.2b)
Fill the holes with wet cement within 3” of your grade (2 bags of Pre-
Mix Concrete-Sold Seperately). The vinyl post bottoms should insert
themselves approximately 1" into the concrete. (Figure 4.2b)
Thank You For Your Purchase
Arbor Assembly Instructions
Please Read Through Before Starting Assembly
General Information
• When assembling components, place on a non-abrasive surface to avoid scratching.
• While assembling the components do not use excessive force otherwise the components can be damaged.
Figure 4.1
Metal Ground Anchor
Figure 4.2b
6x18” deep hole
Blocks of wood,
bricks, or stones
Pre-Mix Concrete
Front View Side View

Summary of content (2 pages)