Installation Guide
13
point on the ceiling where the plumb line 
intersects. This represents the center of the 
support box. Drill a small hole through the 
ceiling at this point, so it can be located from 
the top of the roof.
4. From the roof, locate and mark the outline 
of the Support Box.
5. Remove shingles or other roof covering as 
necessary to cut the rectangular hole for the 
Support Box. Cut the hole 1/8" larger than the 
dimensions of the Support Box. (Figure 19). 
The rectangular hole should be centered on 
the small hole which you drilled through the 
ceiling to mark the location. Again, verify that 
you are not cutting through rafters or framing 
members.
6. Run the Support Box through the roof 
as shown in Figure 20, and place it so that 
the bottom of the Support Box protrudes at 
least 2" below the nished ceiling. Align the 
Support Box vertically and horizontally with 
a level. Temporarily tack the Support Box in 
place through the inside walls and into the 
roof sheathing.
7. Using tin snips, cut the Support Box from 
the top corners down to the roof line, and 
fold the resulting ap over the roof sheathing 
(Figure 21). Before nailing it to roof, run a 
bead of non-hardening sealant around the 
outside top edges of the Support Box so as 
to make a seal between the box and the roof. 
Clean out any combustible material or debris 
from inside the Support Box.
8. Place the Pipe Clamp, (which comes as a 
component of the Support Box) around the 
top of the hole in the bottom of the Support 
Box (Figure 23).
9. Connect the necessary amount of pipe 
sections to reach the stove at a point where 
the Cap will be at least 12" above the roof 
(Figure 22).
10. Run the assembled pieces of pellet 
vent pipe down through the Clamp of the 
Support Box and connect to the appliance 
with a Pipe Adapter. Using a level, make slight 
adjustments in the position of the appliance 
Figure 18
Figure 19
Figure 20
Figure 21










