Installation Guide
8
Support, refer to the Square ceiling installation 
below. The Round Ceiling Support Box has 
the option of a square or round Trim Collar 
available (Fig 5). The bottom of the Round 
Support Box must extend at least 3 inches 
below the nished ceiling. Level the Support 
Box and secure it to the framing using at least 
three 8-penny nails per side (min. of 12 total). 
Alternatively, you may use 1-1/2” #8 wood 
screws (min. of 12 total), instead of nails. 
Next, secure the Trim Collar (round or square) 
to the framing members using the (4) 1” long, 
round-head wood screws provided (Fig 6). 
For installation into a cathedral ceiling, you 
must use the Square Ceiling Support Box or 
Reduced Clearance Support Box (or the CAS 
Ceiling Support if installing the CAS system) 
and the two-piece Trim. The bottom of the 
square portion of the Support Box must be a 
minimum of 2-inches lower (round portion is 
an additional 3 inches lower) than the nished 
ceiling at the lowest side of the penetration 
(Fig 5 & 6). Level the Support Box and 
secure it to the framing using at least three (3) 
8-penny nails per side (minimum of 12 nails 
total), or a minimum of (3) #8, 1-1/2” wood 
screws. Adjust the overlapping “U-shaped” 
Trim pieces so they cover the Support Box, 
and secure them to the framing members 
using the (6) 1-1/4” long, round head wood 
screws provided (see Fig 6). 
4. Frame Openings: Frame openings in 
each ceiling or oor above the Support Box 
(Fig 7). These openings are to hold the 
Firestop Radiation Shield and Attic Insulation 
Shield. Locate each opening by dropping a 
plumb bob to the four corners of the opening 
below. Maintain the framing dimensions as 
specied in Table 2. 
 Warning: other than the framing for the 
Reduced Clearance Support Box, any 
combustible materials around the chimney 
must still meet the minimum 2” clearance 
requirement. If Elbows must be used to 
avoid an obstruction, refer to the Offset Elbow 
Installation section. 
5. Cut Roof Opening: Cut an opening in the 
roof directly above the opening below, and 
at least 4 inches larger than the chimney’s 
outside diameter to provide at least a 
2-inch clearance all around the chimney. 
The chimney must be centered within this 
Figure 6
Figure 7
MIN OF 2 
INCHES 
BELOW 
FINISHED 
CEILING
WOOD SCREWS ARE 
REQUIRED
WOOD SCREWS ARE 
REQUIRED
ROUND CEILING 
SUPPORT WITH TRIM 
IN PLACE
SQUARE CEILING 
SUPPORT BOX WITH 
TRIM FRAME 
IN PLACE
CAP
ADJUSTABLE 
FLASHING
CHIMNEY 
SECTION
ATTIC 
INSULATION 
SHIELD
STORM 
COLLAR
FIRESTOP 
RADIATION 
SHIELD
CHIMNEY 
SECTION
FRAMED 
ENCLOSURE
2 INCH MIN 
CLEARANCE 
TO INSIDE OF 
ENCLOSURE
MIN OF 3 
INCHES BELOW 
FINISHEDCEILING
18 INCH MIN FOR 
SINGLE WALL 
STOVEPIPE










