User guide
17
the centerline of the venting system 
on the ceiling and drill a small hole 
through the ceiling and roof at this 
point. From the roof, locate the drill 
hole and mark the outline of the 
Cathedral Ceiling Support Box. 
Step 3.  Remove shingles or other 
roof covering as necessary to cut the 
rectangular hole for the Support Box 
(refer to Table 1 for dimensions). 
Cut the hole 1/8-inch larger than the 
Support Box outline.
Step 4. Lower the Support Box 
through the hole in the roof until 
Support Box protrudes at least 
2-inches below the low side of the 
ceiling (Fig. 20). Align the Support 
Box both vertically and horizontally 
with a level. Temporarily tack the 
Support Box in place through 
the inside walls and into the roof 
sheathing.
Step 5.  Using tin snips, cut the 
Support Box from the top corners 
down to the rooine, and fold the 
resulting aps over the roof sheathing. 
The aps may be trimmed as needed 
(Fig. 21). Before nailing it to the roof, 
run a bead of non-hardening sealant 
around the Support Box, to make a 
seal between the Support Box and 
the roof. Clean out any combustible 
material from inside the Support Box.
Step 6.  Follow Steps 4 and 5 
(page 14) of the Vertical Installation 
Instructions.
Step 7. Place the Support Clamp 
(provided with the Support Box) inside 
the Support Box (at the bottom), 
and secure to the Pipe Section. 
The Clamp allows the Support Box 
to support the weight of the Pipe 
SUPPORT
BOX
CATHEDRAL
CEILING
SCREWS
TRIM
CEILING
OVERLAP
LEVEL
CATHEDRAL
CEILING
FINISHED
CEILING
2' MIN
BELOW
CUT HOLE 1/8"
LARGER THAN 
SUPPORT BOX
SUPPORT BOX