Installation Manual

3
© 06-2017
968.074.00.0 (00)
Installation
Montageregeln996.506.00.0
Installation Requirements
To install tank and carrier, a 2 x 6" wood frame or
metal frame construction is required. Studs must
be placed 19 3/4" apart (clearance) where carrier
will be positioned inside the wall.
Bowl Finished Rim Height (FRH)
Remove carrier and installation hardware from its
box. Determine FRH for wall-hung bowl and adjust
carrier height in accordance with requirement.
Dimensions can be taken from bowl or carrier
specification sheet. Be sure to allow for finished
floor and sole plate height.
996.506.00.0
Discharge elbow installation
1
2
3
4
3½"–4¾"
(90–120)
3¹⁄₈"–5³⁄₁₆"
(105–135)
3
1
/2
"-4
3
/4
"
(90-120)
4
1
/8
"-5
3
/16
"
(105-135)
4
1
/8
"-5
3
/16
"
(105-135)
AB
C
D
E F