Installation Sheet

Table Of Contents
24:00:00
> >
> > >
> Close access panel.
> Seal to avoid spray water.
> Open only with a tool.
> Finish wall and tiles.
> Provide access panel 7⅞x7⅞in
(200x200mm) in the area of the
drain and overflow.
> Fill the bathtub with water.
> Fill the bathtub with water.
> Inspect for potential leaks.
> Let it sit for 24 h before draining.
NOTICE
Silicone with acetic acid can damage
the bathtub.
> Use alkoxy based silicone.
> Apply silicone as needed.
10 57223_MAL_Tiled bathtub_US/18.11.1
en
1 2 3
4 5 6 24 23 22
21 20 19