Installation Sheet
4x
1 2 3
4
5 6 7
8
Reference the washbasin
specification (page 1) to
establish the height and
spacing of the mounting bolts.
Using the appropriate bit for the
wall material, drill pilot holes.
The plastic anchors provided
are for concrete wall
applications.
For wood stud walls, bolts
should be screwed into wood
backing.
When mounting the washbasin
into a wood stud wall, there
must be adequate bracing. We
recommend doubling up 2 x 6‘
or 2 x 8‘s between the studs to
form a solid anchoring point.
Screw mounting bolts into the
pre-drilled holes with an
adjustable wrench. Screw in
the full length of the mounting
bolt, so that the lag thread is
no longer visible. Carefully
slide washbasin onto the
mounting bolts, Insert the
white plastic sleeve over bolt
and into the hole in the
washbasin. Install provided
washer and nut. Hand tighten
the nut, so the washbasin is
secure. Install the siphon.
Remove the vanity drawer. Using a screwdriver adjust the
vanity mounting hinge system
counter-clockwise.
Slide the vanity under the
washbasin. Tighten mounting
bolts with a wrench until the
washbasin is stable.
MAL_Darling New_DN6472/15.04.1