Operation Manual

Switch b2
After the trimming of the upper thread switch b2 operated by cam 1 determines the
timing for lowering the thread catcher.
Cam 1 is connected to the length setting slide.
With the setting of a different buttonhole length the correct switch timing is thus set
automatically.
Just before ending the left buttonhole seam turn the handwheel until it catches. The
sewing drive turns off.
Turn the material support plate with the hand crank about 6 mm farther.
At this time switch b2 should be operated by cam 1.
The thread catcher lowers.
Adjust switch b2.
Correct the switch timing after a trial run, if necessary.
The upper thread must be caught about 2 mm behind pin 2.
2b1 b2 1
94