Specifications

Electric Boosted Solar
25
H3163 025247 Rev. D
Tick Task See Step No.
Installer’s Guide read 1
Safety audit conducted 2
Existing tank removed 3
New storage tank safely positioned on a level surface 4
Cold and hot water pipes connected 5
Collectors aligned and attached to roof 6 – 11
Fittings attached to collectors 12 – 16
4 Way Union Assembly fitted 17
Anti-Frost Valve fitted 18
Roof penetration sealed with a flexible waterproof flashing 19
Temperature sensor installed 20 – 21
Non return valve fitted 22
PTR valve fitted 23
GPO installed 24
Tempering valve fitted 25
Commissioning the water heater 26
Commissioning Checklist