Installation Guide

INSTALLATION INSTRUCTIONS
SIDE MOUNT POST SYSTEMS
Tools and/or Materials Required:
Shovel or posthole digger
Concrete mix and gravel (optional)
Level, ½ inch open/box end wrench or socket set.
Fastening hardware - included
Other tools/materials may also be necessary depending upon actual installation.
Installation Procedure:
1. General Installation Requirements
: Customers are required to contact the local Post Office before
installing the mailbox to insure its correct placement and height at the street. Generally, mailboxes are
installed at a height of 41–45 inches from the road surface to inside floor of the mailbox or point of mail
entry (locked designs) and are set back 6 – 8 inches from front face of curb or road edge to the mailbox
door.
2. Dig a hole for the in-ground mailbox post. Hole should be approximately 6” in diameter and 24-28” deep.
Use level to straighten pole, back fill hole and tamp dirt as needed (Note: “Quick Crete” or concrete may
also be used – installations at highways edge require separate instructions).
3. Periodically check the vertical alignment of the post when back filling or as the concrete is curing.
4. When back fill tamping is complete, or concrete is cured, you are now ready to mount the mailbox to the
side mount post system – See Side Mount Mailbox Mounting Instructions (below)
CONCRETE MUST BE BELOW FROST LINE. TAKE CARE NOT TO PUNCTURE WATER SEWER,
GAS, CABLE OR TELEPHONE LINES WHEN DIGGING HOLES.
Side Mount Mailbox Mounting Instructions:
1. Locate and place mailbox on its side.
2. Locate the knock outs on the side that will face the post and knock out the holes as shown in
Figure 1 below.
Figure 1
3. Rotate mailbox and place it on its head upside down and locate the knock outs that will face the post
bracket and knock out the holes as shown in Figure 2 below.