050139_dwt_Au bau_GB 10.10.
050139_dwt_Au bau_GB 10.10.2005 08:50 Uhr Seite 2 Dear dwt-customer, thank you for your trust! This leaflet explains step by step the assembly of your awning and offers important care tips to maintain its quality. Please keep it in a safe place! Competent specialist production and quality control staff, together with the selected materials, of which some are especially made for dwt, guarantee a constant high quality. If you follow our advice, you can enjoy your dwt awning for many years.
050139_dwt_Au bau_GB 10.10.2005 08:50 Uhr Seite 3 Before the Assembly Trying is better than studying! Before you take the first trip with your new awning, we would strongly Good planning is half the battle! Please read the instruction manual thoroughly and check that all accessories advice that you conduct a trial assembly, so you can get to know the technical details and accessories. are there. ! The delivered accessories are designed for normal weather conditions.
050139_dwt_Au bau_GB 10.10.2005 08:50 Uhr Seite 4 Complete Awnings and Sun Canopies Determine the awning size ! Measure, through the caravan edge piping profile, from point A to point B – this is the awning size; A and B are the awning tensioning points. A ! B Fixing the wall eyelets to the caravan " BStarting at the front of the vehicle, pull the awning roof in the piping profile until both sides of F the roof have the same distance from the ground (measured vertically down). C Approx.
050139_dwt_Au bau_GB 10.10.2005 08:50 Uhr Seite 5 Left or right partial awnings & Pull the awning roof in the piping profile and start at the rear with a left partial awning D C at the front with a right partial awning The wall eyelet fixing point for a partial awning is on the awning side (C), 10 cm above the side roof & seam. The vertical wall has a pole pocket. Here you can fix a wall eyelet at position (D) on the F caravan, 2 cm underneath the piping profile.
050139_dwt_Au bau_GB 10.10.2005 08:50 Uhr Seite 6 This is How You Assemble Your Awning (Complete- and Partial Awnings and Sun Canopies) Preparing everything ! Check that the poles set is complete and lay out all the poles in front of the caravan, as described ! in the pole plan. Fix the screws and pole clamps to the poles; put the vertical poles in the corner pieces. Ridge- and gable poles can be pre-assembled, but do not assemble them to the corner pieces yet.
050139_dwt_Au bau_GB 10.10.2005 08:50 Uhr Seite 7 Now you can tension the awning roof & Close all the zips and adjust the height of the side- and the front walls so that the zips are horizontal and vertical – the telescopic poles can be adjusted to suit all uneven surfaces. Now tension the ridge poles slightly, starting in the middle. Then put in the roof front supports. & ' Most of the awning models are equipped with hollow seams in the roof front.
050139_dwt_Au bau_GB 10.10.2005 08:50 Uhr Seite 8 Free Standing Caravan Awnings, Motorcaravan-, Bus- and Frame Tents Prepare everything " Check that the poles set is complete and according to the plan. Fix the screws and the pole clamps to the poles. ! Lay out the poles and corner pieces according to the plan on the ground and assembly the roof ring (corner, ridge- and gable poles). Roof front supports are not to be assembled yet.
050139_dwt_Au bau_GB 10.10.2005 08:50 Uhr Seite 9 The last part is the ground tensioning " Hook all the tensioning elements that are not sewn in to the ground skirt. Adjust the poles so that the vertical seams are over the vertical poles. Tent corners and zip ends are to be tensioned by using the pegs and the other fixing points with ground nails. You can tension the walls by pulling the corner poles outward and securing the corners to the ground.
050139_dwt_Au bau_GB 10.10.2005 08:50 Uhr Seite 10 Annex for Caravan Awnings (Awning Extension) Prepare everything for the extension " Before the assembly of the annex, the awning must be completely tensioned! Open the side wall of ! the awning on the annex side – you will find it much easier. ! Check that the pole set is complete and lay out the poles on the ground according to the plan.
050139_dwt_Au bau_GB 10.10.2005 08:50 Uhr Seite 11 " Assembly of an annex with a zip Take out the right awning side wall, connect the annex zip to the awning zip ends and close the zip. Now the awning and annex are connected. " Put up the annex poles under the tent and fix to the outer ridge poles of the awning. " " When tensioning, please ensure that the seams of the annex roof corners are over the pole corners. Now you can fix the tapes to the poles.
050139_dwt_Au bau_GB 10.10.2005 08:50 Uhr Seite 12 Tips for dealing with the different equipment details (are different depending on the awning model!) Curtains… Side wall clasps… … are attached with curtain runners, fixed in the curtain band loops, … are sewn in on the left and right hand side at the rear inside of the to the curtain rail over the window. The curtains are pulled on to the roof. Relieve the zips by fastening the clasps. sewn-in curtain rail.
050139_dwt_Au bau_GB 10.10.2005 08:50 Uhr Seite 13 Soft care keeps the beauty! Always pack away your tent dry! If this is not possible, please lay it out to dry after a maximum period of 12 hours. Your tent does not tolerate strong washing detergents! PVC coated material and trailtex can be rinsed with clean water. Zips are easier to use if treated now and then with zip-spray from the specialist supplier.
050139_dwt_Au bau_GB 10.10.2005 08:50 Uhr Seite 14 User Information dwt awnings are produced to the highest quality. Certain material characteristics, which may be interpreted as defects, are inherent to the materials and may occur, despite the experienced production- and technical processes.
050139_dwt_Au bau_GB 10.10.2005 08:50 Uhr Seite 15 Complaints/Return Changes / repairs / ordering spare parts When there is a reason to complain or to return the goods, please To be able to carry out your order, your specialist supplier needs contact your specialist supplier – they will take care of things for you.
050139_dwt_Au bau_GB 10.10.