User guide
Multi Process Meter    Instruction Manual 
38 
Multi-Point Calibration & Scaling 
The meter is set up at the factory for 2-point linear calibration. The 
number of points for multi-point calibration/scaling is set up in the 
Advanced Features menu. Up to 32 linearization points may be selected 
for PV1 and up to 8 linearization points may be selected for PV2. See 
page 74 for details. 
Panel Meter Pro Software 
The meter can also be programmed using the PC-based Panel Meter 
Pro software available for free download at www.dwyer-inst.com. 
Data logging for one meter at a time is available with Panel Meter Pro 
software. More advanced data acquisition may be accomplished by 
using any Modbus RTU compliant software. 
In order to program the meter using a computer, the meter must be 
connected using a RS-232 or RS-485 serial adapter, see ORDERING 
INFORMATION on page 7 for details. 
Scaling the Meter (SCALE) 
The process input (4-20 mA, 10 VDC) can be scaled to display the 
process variable in engineering units. 
A signal source is not needed to scale the meter; simply program the 
inputs and corresponding display values. 
For instructions on how to program 
numeric values see Setting Numeric 
Values, page 32. 










