User Manual
Rev5 MN890570 19of30
WIRING StepEight
Switching Inductive Loads:The use of suppressors (snubbers) is strongly recommended when switching
inductiveloadstopreventdisruptingthemicroprocessor’soperation.Thesuppressorsalsoprolongthelife of
therelaycontacts.SuppressioncanbeobtainedwithacatchdiodeforDCcircuitsandaresistor‐capacitor(RC)
forACcircuits.
CatchDiode
Alwaysusestepperrelaysbetweenthesensorandexternalloads.
ForDCcircuitsuseacatchdiodesuchas1N4148,shownonleft.
RefertothefollowingcircuitsforRCnetworkassemblyandinstallation:
ChooseRandCasfollows:
R:0.5to1Ohmsforeachvoltacrossthecontacts
C:0.5to1μFforeachampthroughclosedcontacts
Notes:
1. Usecapacitorsratedfor250VAC.
2. RCnetworksmayaffectloadreleasetimeofsolenoidloads.Check
toconfirmproperoperation.
3. InstalltheRCnetworkatthemetersrelayscrewterminals.AnRC
networkmayalsobeinstalledacrosstheload.Experimentforbest
results.
VoltageOutput:SeriesULScanbeusedasa0to5or0to10VDCoutputdevice.Aresistorwillneedtobe
addedtothecircuittoenableavoltageoutput(refertothewiringdiagrambelow).
0‐5VDCoutput
o Adda250Ohmresistor
o Actualoutputwillbe0.8to5VDC
0‐10VDCoutput
o Adda500Ohmresistor
o Actualoutputwillbe2to10VDC
WhenusingULSX‐CAL,underNumber
ofPumps,select4‐20mATransmitterOnlytosimplifytheconfiguration
inULSX‐CAL.










