Installation Sheet

- 2 -
7302420-100 Rev. A (6/2020)
Carefully unpack lavatory and place in the center of opening on the underside
of the marble top as an under counter mount installation. Ensure lavatory
is centered evenly over underside of marble top opening front to back, side
to side and trace a pencil line around the perimeter of the lavatory onto the
underside of the marble top.
Mark the wall using the provided wooden cleat at each of the pre drilled pilot hole locations
where the vanity will be hung and level.
NOTE: If using optional vanity legs, ensure height of vanity once hung on cleat is at the correct height.
Screw the cleat into place using #10 x 2” screws.
Carefully lift the vanity onto the cleat and ensure vanity sits at and
square to the surface of the wall with no gaps between vanity and wall.
Ensure vanity is level.
Remove lavatory and apply silicone sealant around the traced pencil line of
the marble top.
7
3
8
4
5
6
Place lavatory back onto underside of marble top within the traced
pencil line. Further attach the sink to the marble top using the supplied
sink clips and screws at 4 locations to hold lavatory in place.
Carefully tighten all 4 screws alternately, do not overtighten.
Clean off any sealant that may have run out.
Install faucet and drain to sink according to manufacturer’s instructions.
NOTE: If installing optional vanity legs, proceed to Installation of Vanity Legs on page 4
1/2 MIN.
Clip
Brass insert
#10-32 Machine screw