Installation Sheet
- 2 -
1-1/4" MAX.
4
3
1
2
TUB DECK OR
MOUNTING SURFACE
HOT
4
3
1
5
2
2
6
M965850 (8/17)
2
3
1
INSTALL HANDLES AND SUPPLY HOSES
REMOVE HANDLE ASSEMBLIES FROM VALVE BODIES
SPOUT ASSEMBLY
CAUTION
Turn off hot and cold water
supplies before beginning.
INSTALL HANDLES
• Turn VALVE STEMS (1) to off position. Align LEVERS (2) as shown or
as desired and install HANDLE ASSEMBLY (4) onto VALVE STEM (1).
• Thread HANDLE BASE (3) clock-wise onto VALVE BODY
THREADS (5a) until seated tightly against mounting surface
and aligned with the dotted line in the illustration.
INSTALL SUPPLY HOSES
• Thread supply hose COUPLING NUTS (6) onto outlets on VALVE
BODIES (5). Tighten with an adjustable wrench making a water
tight connection.
Important: Loop SUPPLY HOSES (7) as illustrated so they do not kink.
• Thread LOCKNUT (1) to bottom of VALVE BODY (2). Make sure RUBBER WASHER (3) is installed.
Insert VALVE BODY (2) through mounting hole from underside of lavatory or mounting surface.
Note: VALVE BODY marked Hot is installed in the left mounting. hole,
VALVE BODY marked Cold in the right when facing front of fitting.
Maximum mounting surface thickness is 1-1/4˝.
• From top install SPACER (4) and HANDLE (6) onto VALVE BODY (2).
Set VALVE BODIES (2) so that their outlets are facing toward SHANK (5)
and then tighten LOCKNUT (1) using wrench or other approprite
wrench to secure
VALVE BODIES (2)
to mounting surface.
1
2
3
7
8
GROOVE
4
6
5
3
1
5a
2
6
6
5
4
5
7
• Insert SPOUT SHANK (1) through center hole of sink or mounting
surface. Make sure RUBBER WASHER (2) is seated into groove
in SPOUT ESCUTCHEON BASE (3).
• Assemble RUBBER WASHER (4), BRASS WASHER (5) and
LOCKNUT (6) onto threads of SPOUT SHANK (1) from underside
of lavatory or mounting surface.
• Align SPOUT (7) and tighten LOCKNUT (6). Insert LIFT ROD (8)
through SPOUT (7).