Installation Sheet

- 3 -
M965829 (4/17)
2
3
MAKE WATER SUPPLY AND WASTE CONNECTIONS
Connect FLEXIBLE SUPPLIES (1, 2) directly to wall supplies.
Connection on tting supplies are 3/8" (10 mm) compression. Connect
left SUPPLY (1) to Hot (Marked with a Red Band) and right supply
to COLD (2) wall supply.
• Faucet supplies are 30" (762 mm) long from faucet base.
Note: If additional supply length is required, installer must
purchase additional parts separately.
Important: If SUPPLY HOSES (1, 2) are to long, loop as
illustrated to avoid kinking.
Connect 1-1/4" O.D. (32 mm) tailpiece on POP-UP DRAIN to
waste outlet.
24"
(610mm)
1
2
COLD
HOT
3/8" (10mm)
COMPRESSION
PUTTY
2
1
3
4
5
Apply a bead of PUTTY to underside of
DRAIN BODY FLANGE (1).
• Feed DRAIN BODY (1)) down through lavatory.
Assembly GASKET (2) WASHER (3) and LOCKNUT (4)
onto DRAIN BODY (1). Tighten LOCKNUT (4) rmly.
• Assembly TAILPIECE (5) to DRAIN BODY (1).
DRAIN INSTALLATION