Installation Sheet

- 3 -
WASTE
OUTLET
1-1/4" O.D.
TAILPIECE
M965816 Rev. 1.0 (7/17)
TEE ASSEMBLY
4
MAKE WATER SUPPLY AND WASTE CONNECTIONS
NOTE: FLEXIBLE SUPPLIES OR BULL-NOSE RISERS NOT INCLUDED
AND MUST BE PURCHASED SEPARATELY.
Connect water supply to VALVE BODIES (1,1A) with
1/2" IPS FLEXIBLE SUPPLIES (2) or 3/8" O.D.
BULL-NOSE RISERS (3). Use adjustable wrench to
tighten connections. Do not over tighten. Be careful
not to kink copper supply when bending. Use tubing
cutter to cut to proper length.
Connect HOT water supply to inlet of left SHANK
and COLD water supply to right SHANK using sealant,
appropriate connectors, and COUPLING NUTS.
HOT
COLD
FERRULE
COMPRESSION
NUT
COUPLING
NUT
FLEXIBLE
SUPPLIES
3/8 O.D.
BULL-NOSE
RISERS
1/2" PIPE
THREAD
3/8 COMPRESSION
CONNECTION
2
3
1A
1
5
6
Apply a bead of PUTTY to underside of
DRAIN BODY FLANGE (1).
• Feed DRAIN BODY (1)) down through lavatory.
Assembly GASKET (2) WASHER (3) and LOCKNUT (4)
onto DRAIN BODY (1). Tighten LOCKNUT (4) rmly.
• Assembly TAILPIECE (5) to DRAIN BODY (1).
• Connect 1-1/4" O.D. tailpiece on POP-UP DRAIN to waste outlet.
DRAIN INSTALLATION
CONNECT DRAIN
PUTTY
2
1
3
4
5