Manual

LOADERS AND FEED NECK
AIR/NITROGEN OPTIONS
LOADERS AND FEED NECK
To achieve the maximum performance of the PMR you will need to use a motorized loader that force
feeds paintballs into the PMR marker. Using a slower motorized loader or a non-motorized loader will
work but the rate of fire will be reduced.
To fit a loader onto the PMR:
1. Loosen the feed neck adjustment screw with a 5/32” allen key
2. Push the loader all the way into the feed neck
3. Tighten the feed neck adjustment screw until loader is secure. Note that using too much force
tightening the screw could cause damage to your loader.
There is no maintenance needed for the feed neck besides keeping it clean of
broken paint, dirt and debris.
AIR / NITROGEN TANK OPTIONS AND INSTALLATION
The PMR will only work with Compressed air or Nitrogen air systems such as the
DYE Throttle air system. Do not use CO
2
or any other compressed gas. The
output pressure from the air system has to be between 400 – 850psi
To install an air system screw tank into the airport all the way as far as it goes. To
remove the air system screw out. There will be gas leaking for a few seconds
while you screw the air system out. Notice that even with the air system removed
there can be gas inside the PMR and it can still fire a paintball. Always treat the
marker as being live and never point it to anything you don’t intend to shoot at!
10
11
AIRPORT
ASSEMBLY AND MAINTENANCE
AIRPORT ADJUSTMENT AND MAINTENANCE
The location of the airport adapter can be moved approximately 1
1
4 back
or forward from
the stock position to fit your individual preference. To change the position:
1. Open the two left side grip panel screws with a 3/32” allen key
2. remove the 9V battery
3. using a 3/32” allen key loosen the airport locking screw until airport
slides back and forth loosely
4. set the airport to the desired position
5. tighten then airport locking screw, install the 9V battery back and tighten
the two grip panel screws
Before screwing in the air system into the airport always check that the
threads both on the air system and the airport are clean and not worn out.
If you think the threads are not in good condition contact DYE Precision or
a professional store before screwing in the air system.
AIRPORT PIN DEPRESSOR
The airport supplied with the PMR comes with an adjustable pin depressor.
It’s preset to work with most of the systems on the market but if needed it
can be adjusted.
To adjust the pin depressor remove the hose from the front of the airport
by pushing the gray plastic housing towards the fitting and pulling the hose
out. Next use a 3/32” allen key to move the set screw mounted inside the
Airport Turn the screw back a few turns so that the pin valve on the air
system will never be pressed.
Next:
1. Screw on the air system used on the gun into the airport all the way, no air should come out.
2. Turn the pin depressor screw in until a small amount of air starts to come out
3. turn the air system out about half a turn, air leak should stop
4. Screw in the pin depressor screw enough for air to start leaking again.
5. Screw out the air system and connect hose again.
6. Now the pin depressor screw is set to the optimal point for your air system.
If the screw is set too far out the pin valve on the air system is opened too early
and air will leak out trough the exhaust hole on the top of the airport. If the
screw is not far enough the pin valve on the airport will never be opened or
will be opened too little for good flow.
W
W
W
.PRO
TOPAINTBALL.COM