Owner`s manual

No heat or heat too low
Pump will not prime
Jets won't come on
Probable Cause #1
Action
Dirty Filter
Clean Filter / Pull Filter and try running without filter
Probable Cause #2
Action
Probable Cause #3
Action
Breaker at house off.
Reset breaker at house. Breaker can appear to
be on and one pole can be off. Turn breaker OFF
then ON twice.
Pump not primed.
Refer to the section of this manual on pump
priming
Probable Cause #4
Action
Improper line voltage.
Have a Licensed Electrician check the line voltage.
Probable Cause #1
Action
No water in pump
Make sure water level in spa is correct. Adjust bleed
screw located on spa wall next to skimmer area.
Probable Cause #1
Action
Pump not primed.
Refer to the section of this manual on pump priming.
Probable Cause #2
Action
Gates Valves closed.
Check to see if gate valves are in the correct position.
Check to see that pump is purged in.
Probable Cause #2
Action
Closed gate valves or blocked lines.
Open all gate valves. Check suction for blockage.
Probable Cause #4
Action
Air lock
Adjust bleed screw located on spa wall next to
skimmer area.
Probable Cause #3
Action
Pump surges, jets lose power, then comes back,
then loses power again etc.
Check union on front or nose of pump to ensure
tightness. Check drain plugs to ensure tightness.
Trouble Shooting Guide
Getting Ready For Delivery & Set-up Of Your New Spa
Surface And Pad Requirements
Balconies And Deck Requirements
Access & Clearance
Electrical Requirements
Wiring Requirements
Your new portable spa must be placed on a uniformly firm, flat, and level
surface. A concrete pad 4 inches thick is best.
Your spa requires up to 40" of clearance through gates between house
and side fences, and up to 8.5' overhead clearance depending on the size
of the unit.
Your 220 Volt spa pack will require a 50 amp dedicated GFCI circuit
breaker.
4 Wire #6 Gauge copper wire
over 50 ft. 2-Hots, 1-Neutral,
1-Isolated Ground
The clearance required to turn a corner can be equal to the length of the
spa.
All debris blocking access to the job site must be removed prior
to delivery. Any trimming of trees or bushes, removal of debris, leveling
of ground or other general maintenance must be done prior to
delivery and is the responsibility of the customer.
Decking must be constructed to support 85 pounds per square foot.
Balconies must be constructed to meet current state and local codes.
Gates must be self-closing and self-latching.
If your spa is located near sprinklers, adjust or cap them so as not to
hit the siding of the spa.
Set-up & Delivery Guidelines
4 Wire #8 Gauge copper wire
under 50 ft. 2-Hots, 1-Neutral,
1-Isolated Ground
8 29