Operating instructions
Swim Spa Operator’s Guide
GENERAL PRE-OPERATION INSTRUCTIONS
PRIMING PUMP FOR ELECTRIC PACKS
The power pack system is located under the skirting. The equipment can be serviced by simply
removing the door. The door is located on the side of the swim spa where three panels are located,
usually on the side of the swim spa with the lounger, or the side where the topside control panel is
located.
It is important to make sure that all of the air is out of the pump(s) before operating. To do this follow
procedures below:
Set thermostat, located on top side control panel, to desired temperature and continue heating until desired temperature
has been reached. Depending on equipment, this will normally take 8 to 10 hours.
WARNING: Do not run swim spa with gate valves closed or run pump with no water
circulating in swim spa for long periods. This could damage the swim spa equipment.
Note: Equipment style and location will vary by model
Turn off power at the breaker
Make sure the gate valves are open
Fill the swim spa with water going thru the lter
Turn the power on at the breaker
Start the pump on low speed and water should start circulating within one to two minutes. If
water does not start circulating, turn pump from low to high until prime is picked up.
If pump still does not prime, please see “Trouble Shooting Guide” located in the back of this
manual
•
•
•
•
•
•
Auxiliary Heater
Control Pack &
Heater
12 volt
power supply
Ozone
LED
controller
Customer Access
Electrical hook up
Return from Pump1
NOTE!
WARNING!
23