Service manual
9650-0801-01 Rev. A ZOLL Propaq MD Service Manual 5
Chapter 1
 Maintenance Tests
Propaq MD Overview
This chapter includes step-by-step procedures for the following types of maintenance tests:
• Calibration and Calibration Checks
• NIBP Valve, Pump, and Tubing Integrity Tests
• Operational Tests
• Functional Verification Tests
At a minimum, a trained biomedical technician must perform a CO
2
 calibration and an NIBP 
calibration check once per year. A CO
2
 calibration check may be performed at any time to 
verify the CO
2
 calibration.
The Troubleshooting chapter in this manual may recommend performing one of more of the 
NIBP valve, pump, and tubing integrity tests to help identify and correct potential issues with 
the NIBP valve, pump, and/or tubing.
It is necessary to perform Functional Verification Tests after a module is repaired to ensure that 
the functions of the Propaq MD unit work properly.
Because the Propaq MD units must be maintained ready for immediate use, it is important for 
users to conduct the Operator’s Shift Checklist procedure at the beginning of every shift. This 
procedure can be completed in a few minutes and requires no additional test equipment. (See 
the ZOLL Propaq MD Operator’s Guide for the Operator’s Shift Checklist.) It is highly 
recommended that the Operational Tests be performed at regular intervals to augment the 
automatic testing the Propaq MD does to ensure readiness.










