User Guide
Control Panel Interface Installation and User Guide
APPENDIXD
Power Requirements and Installation—Excluding North America and Japan
D-10
CONNECTING THE DYNO
1 Turn off the main circuit breaker on the dyno. This is the large breaker in the
center of the power distribution assembly behind the door on the left hand side
of the dyno. Refer to page 1-3 for breaker location. Off is the down position.
2 Once you verify the voltages on the receptacle, connect the dyno to the
receptacle.
3 Connect the high pressure blowers to the dyno. For more information on
installing and connecting the blowers, refer to page 1-11 and page 1-19.
4 Turn on the main dyno breaker. Refer to page 1-3 for breaker location.
5 Test the blowers for operation.
6 Turn on the dyno electronics and verify operation.