user manual

MOBILE BASE INSTALLATION
Eddy Current Brake
Version 1 Mobile Base Installation Guide
1-15
ATTACHING THE CABLES
1 Using a fork lift, or other suitable means, remove the dyno from the blocks.
2 Route the input power cable under and out the front of the dyno.
3 Attach the input power cable to the Theta Controller.
4 Route the brake power cable through the dyno as shown in Figure 1-21 and attach
the cable to the Theta Controller. Secure the rubber grommet in the hole.
5 Route the temperature sensor cable from the eddy current brake through the
dyno to the Breakout board.
Figure 1-21: Attach the Eddy Current Brake Cables
temp sensor
cable
brake power
cable
input power
cable
breakout board
large
grommet