Owner's manual

Torque Module Installation and User Guide for Model 250i Dynamometers
CHAPTER 1
Load Cell Installation
1-8
INSTALLING THE LOAD CELL
1 Verify the main dyno power is disconnected. Refer to page 1-3 for more
information.
2 Remove the two bolts and nuts securing the existing bar on the eddy current
brake and remove the bar. Set the bolts and nuts aside.
Figure 1-7: Remove the Existing Bar
bar