Installation Guide User Manual

Model 200iX/250iX Upgrade Installation Guide
CHAPTER 1
Bulkheads and Covers
1-16
5 Remove the existing 3/8-inch screw from the drum module and secure the toe
kick bracket to the drum module.
6 Attach the blower extension cable to the existing blower cable, disconnected
earlier, by matching up the colors.
7 Route the cables removed from the monitor stand over to the left side of the
dyno.
8 Route any monitor arm cables through the cable pass through.
Note: The monitor stand will be mounted to the left side of the dyno making it
more convenient for motorcycles.
Figure 1-11: Securing the Toe Kick Bracket
toe kick bracket
route monitor stand
cables to left side of dyno
and through the cable
pass through