Installation Guide Owner's manual
Table Of Contents
- Cover
- Copyright
- Table of Contents
- Warnings
- 1 - Specifications and Operating Requirements
- 2 - Stationary Dyno Installation
- 3 - 4WD Dyno Installation
- Unpacking and Inspecting the Dyno
- Track Assembly
- Dyno Installation
- Cable Routing
- Identifying the Cables
- Routing the Cables—Without the Eddy Current Brakes
- Wiring the Breakout Board—Without the Eddy Current Brakes
- Routing the Cables—With One Eddy Current Brake
- Wiring the Breakout Board—With One Eddy Current Brake
- Routing the Cables—With Two Eddy Current Brakes
- Wiring the Advanced Breakout Board—With Two Eddy Current Brakes
- Hydraulic Movement Installation
- Air Can Sleeve
- 4WD Dyno Movement Test
- Bridge Installation—Stationary Dyno
- Bridge Installation—4WD Dyno
- Deck Installation
- Logo Panel Installation
- 4 - Eddy Current Brake Installation
- Eddy Current Brake Installation
- Before Installing the Eddy Current Brake: Verify Optimal Brake Cooling
- Before Installing the Eddy Current Brake: Verify Mounting Holes
- Unpacking the Eddy Current Brake
- Installing the Temperature Sensor
- Installing the Bearing, Splined Shaft, and Driveline Assembly
- Installing the Eddy Current Brake
- Installing the Load Cell
- Installing the Front and Rear Brake Covers and Theta Controller
- Torque Module Installation
- Load Cell Calibration
- Eddy Current Brake Installation
- 5 - Side Deck Assembly Installation
- 6 - Basic Dyno Operation
- A - Red Head Anchor Installation
- B - Power Requirements and Installation
- C - Stationary Dyno Upgrade
- D - Bridge Extension Assembly
- E - Interface Roller Assembly Installation
- F - Torque Values
- Index

Above Ground Model 424x/424xLC
2
Automotive Dynamometer Installation Guide
TABLE OF CONTENTS
ii
Chapter 3 4WD Dyno Installation
Unpacking and Inspecting the Dyno . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-2
Track Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4
Installing the Track Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-6
Dyno Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-8
Removing the Dyno from the Crate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-8
Placing the Dyno on the Track . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-9
Installing the Eddy Current Brake . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-10
Cable Routing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-11
Identifying the Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-11
Routing the Cables—Without the Eddy Current Brakes . . . . . . . . . . . . . .3-12
Wiring the Breakout Board—Without the Eddy Current Brakes . . . . . . . . .3-14
Routing the Cables—With One Eddy Current Brake . . . . . . . . . . . . . . . . .3-15
Wiring the Breakout Board—With One Eddy Current Brake . . . . . . . . . . .3-17
Routing the Cables—With Two Eddy Current Brakes . . . . . . . . . . . . . . . .3-19
Wiring the Advanced Breakout Board—With Two Eddy Current Brakes . . 3-22
Hydraulic Movement Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-24
Rotating the Hydraulic Motor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-28
Filling the Hydraulic Motor with Hydraulic Fluid . . . . . . . . . . . . . . . . . . . . 3-31
Air Can Sleeve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-32
4WD Dyno Movement Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-33
Bridge Installation—Stationary Dyno . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-34
Installing the Drum Guards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-35
Installing the Runner Mounts and Runner Supports . . . . . . . . . . . . . . . . .3-36
Installing the Runner Assemblies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-37
Installing the Bridge Cover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-39
Bridge Installation—4WD Dyno . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-40
Installing the Drum Guards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-41
Installing the Runner Mounts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-42
Installing the Runner Assemblies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-43
Installing the Cover and Runner Tie Straps . . . . . . . . . . . . . . . . . . . . . . . .3-44
Deck Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-45
Logo Panel Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-51