Installation Guide User guide

BASIC DYNO OPERATION
Loading the Vehicle
Version 3 Model SD12 Scooter Dynamometer Installation Guide
3-3
8 Extend the tie-down outriggers.
8a Remove the spring pins.
8b Slide out the tie-down outriggers.
8c Replace the spring pins.
Figure 3-2: Extend the Tie-Down Outriggers
9 Attach two tie-down straps from the tie-downs on the dyno to the frame or
luggage rack of the vehicle.
10 Tighten the tie-down straps evenly making sure the drive wheel remains centered
on the drum.
Never perform a dyno run if the tie-down straps are not in place or they are
damaged.
Figure 3-3: Attach the Tie-Downs
SD002
tie-down
outrigger
spring pin