Valiant 1.3m Manual
EN
Float Installation (Optional)
Float Assembly
1. Install the 2 cross members (A) and the front and rear struts (B) on one
oat as shown and secure with 4 included screws (C).
2. Install the other oat onto the assembled struts as in Step 1 above.
IMPORTANT: The front strut is taller than the rear strut. (Figure 1)
Float Assembly Installation
1. With the landing gear and battery hatch removed, align and mount the
oat assembly to the bottom of the fuselage.
2. Secure the back section of the oats to the fuselage using the 2 included
brackets (A) and 4 screws (B).
3. Secure the front section of the oats using the two larger brackets (C)
and 4 screws (D).
4. Re-install the battery hatch.
Disassemble in reverse order.
Fig. 1
D
B
C
B
A
C
A
7