Installation Guide

2
Instruction Manual for Installing E-Glide Ladder Hardware
Hardware Included:
Step 1: Rail Installation
Special application notes:
Do not mount rail brackets directly onto a drywall
surface. Always mount these brackets to solid
wood, predrilling the holes is advisable to avoid
splitting the wood.
Clearance requirements:
Ladder in the stored position (close to the
wall/cabinet/bookshelf). Leave at least
2 ½” of clearance between the top of the
rail and the ceiling, crown molding or other
overhanging protrusions (figure 1).
Ladder in the climbing position, a minimum 1”
clearance between the top of the rail and any
upper cabinet doors is required to be able to
open these doors (figure 2).
Figure 1 Figure 2
Installation Tools Needed:
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
x2
M5x18
x2
M6x30
(x1)
2mm 4mm
(x1)
3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
1. Rail height determination: Distance from the floor to the location on the header board
where the screw for the rail bracket will be fastened.
For the 92” ladder = 88 1/4” to 89 1/4”
For the 107” ladder = 103 1/4” to 104 1/4”
⁄” Drill Bit
10mm Wrench
Drill
Tape
Measure
Level
#2 Phillips
Screwdriver
Stored Position Climbing Position
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
x2
M5x18
x2
M6x30
(x1)
2mm 4mm
(x1)
3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
x2
M5x18
x2
M6x30
(x1)
2mm 4mm
(x1)
3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
x2
M5x18
x2
M6x30
(x1)
2mm 4mm
(x1)
3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
x2
M5x18
x2
M6x30
(x1)
2mm 4mm
(x1)
3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
x2
M5x18
x2
M6x30
(x1)
2mm 4mm
(x1)
3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
x2
M5x18
x2
M6x30
(x1)
2mm 4mm
(x1)
3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
x2
M5x18
x2
M6x30
(x1)
2mm 4mm
(x1)
3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
x2
x2
M5x18
x2
x28
Pre installation-
TOOLS REQUIRED
2
x4
x4
x1
x7
x28
H
x1
x1
x1
x14
x2
x2
M5x18
x2
M6x30
(x1)
2mm 4mm
(x1)
3mm
A
x2
B
x1
C
D
E
F
G
x2
x7
x4
HARDWARE INCLUDED
x2 x2