3BUS 208 000 R130132 Hardware Installation
Cable requirements are as follows:
Equipment Location
The location of the ASPC, the SPDC, the operator panel, and the blower will be site
specific. Refer to the System Specifications prepared prior to your installation for
details on where each component will be installed.
ASPC Location
The ASPC is designed to be securely mounted to the wall in the paper mill facility.
Refer to Drawing DC-D-130181-001 for details on the weight and hole pattern
required for mounting the ASPC. For information on termination, refer to the
appropriate wire list.
A connection terminal block for the supply voltages is located behind the cover over
the main circuit breakers. The phase conductors of the main 120/240 VAC terminate
directly to the main breaker; neutral and ground to the adjacent terminals.
The European service power and the system 120/240
must be bonded to the same ground.
Scanning Platform Power Distribution Center (SPDC)
The Scanning Platform Power Distribution Center (SPDC) is designed to be
securely mounted to the wall in the paper mill facility.
Operator Control Panel Location
Refer to Drawing DC-D-121599-001 for information on the location and mounting
requirements for the operator panel.
Blower Location
Refer to your blower specific drawings for information on its location and mounting
requirements.
Cable Use Cable Type Max. Run
Comm Link from ASPC to Host
(customer supplied black box
required)
20mA 1000 ft.
Comm Link from ASPC to SWS RS232 / 20 mA 15 ft./1000 ft.
Operator Panel to ASPC connectorized 75 ft.
(standard
length)