INSTRUCTION MANUAL EAGLE PEAK Tunnel Greenhouse 13 Ft x 6.6 Ft x 6.
WARRANTY For warranty, please DO NOT return your product or parts to the manufacturer without contacting EAGLE PEAK Customer Service, the purchaser must obtain prior authorization from EAGLE PEAK Customer Service. Our Customer Service will determine whether a return is required and may request pictures of the unit in place of a return. Please read and save the owner’s manual instructions before attempting to use your greenhouse.
BEFORE ASSEMBLY · Please read and understand this manual before any assembly. Before the assembly of product, make sure all parts are included. Compare parts with above list. · If any part is missing, or if you have any questions, contact us through the website. · Place all parts out of the box in an open area and position them on the floor in front of you. · Remove all wrappers and put them back into the box. Do not dispose of the wrappers until assembly is completed.
PACKAGE INCLUDES ● Assemble the metal frame as shown in the below diagram. No. Part QTY No.
SET UP THE TUNNEL FRAME Step 1 You will need: No. Part QTY No. Part QTY 2 2 8 1 3 2 9 1 4 2 A 1 6 2 B 4 7 1 2 7 B 4 6 3 fig. 3 2 4 7 3 4 fig. 3 2 4 3 6 8 fig. 2 fig. 1 6 fig. 4 fig. 4 6 9 fig. 2 2 8 3 9 8 6 9 B A fig. 1 fig.
SET UP THE TUNNEL FRAME Step 2 You will need: No. Part QTY No. Part QTY 1 4 6 3 4 3 B 6 B 1 6 B B fig. 7 6 2 fig. 6 fig. 5 2X 3X 4 1 6 fig. 7 1 1 fig. 7 1 4 fig. 5 fig. 6 6 6 2 7 fig. 5 5 4 fig.
SET UP THE TUNNEL FRAME Step 3 You will need: No. Part QTY No. Part QTY 1 2 5 5 2 1 B 5 3 1 B 5 1 1 1 3 4 B fig. 10 fig. 9 B 5 1 4 fig. 10 2X fig. 8 1 5 4 5 fig. 9 4 fig. 9 2 3 5 5 fig. 8 fig.
SET UP THE TUNNEL FRAME Step 4 You will need: No. Part QTY No. Part QTY 1 2 6 5 2 1 7 1 3 1 B 5 B 6 1 1 1 2 5 5 B fig. 14 6 B 6 1 5 fig. 14 1 fig. 12 fig. 13 2X 6 5 6 fig. 13 fig. 13 3 5 2 7 3 6 5 B 5 7 6 fig. 12 5 fig. 11 6 fig.
SET UP THE TUNNEL FRAME Step 5 You will need: No. Part QTY No. Part QTY 1 2 9 1 2 1 A 1 3 1 B 5 8 1 1 B B 2 6 6 1 1 fig. 18 8 9 1 fig. 19 6 A fig. 19 1 1 fig. 15 fig. 18 fig. 17 B 6 7 2 3 3 fig. 16 9 fig. 15 8 fig. 16 1 6 B fig. 16 8 2X fig.
SET UP THE TUNNEL FRAME Step 6 You will need: No. C Part QTY 27 ● Put the nut caps on nuts for screw protection purpose.
ATTACH THE PE TOP Step 7 You will need: No. PE Part QTY PE Top 1 ● Attach the PE top and secure the top to the frame using built-in ties.
ROLL UP THE DOOR AND CURTAINS Step 8 ● Roll up the door and curtains if needed.
SECURE THE TUNNEL FRAME Step 9 You will need: No. Part D E QTY No. 4 E ● Attach the ropes on the top and insert stakes in the ground for better stability.
SECURE THE TUNNEL FRAME Step 10 ● Put weights on the overlong cover to help weigh it down.