INSTRUCTION MANUAL EAGLE PEAK 12 FT X 14 FT Double Roof Hardtop Gazebo Thank you for choosing Eagle Peak !
LIMITED WARRANTY Global Shade Corporation offers a limited warranty that this product is free from defects in materials and workmanship for a period of one (1) year from the original date of purchase. At its discretion, Global Shade Corporation may provide replacement parts for defective parts to original purchaser after its own review and examination. Original receipt or proof of purchase as well as proof of defect is required.
WARNING: To reduce the risk of serious injury, read the following safety instructions thoroughly before assembling and using the gazebo. • Check with your local governing authority/local municipal codes regarding installation and permitting of such structures before assembly. • Use of personal protective equipment including gloves, safety glasses, and closed toe footwear is recommended during assembly. • Requires two or more people to assemble and install safely and correctly.
Part List Label A Description Sketch QTY Post 4 B1 Base Cover 4 C1 Base 4 D1 Top Roof Fastening Piece 1 E6 Metal Corner of Big Roof 4 E7 Long Top Tube of Big Roof 2 E8 Short Top Tube of Big Roof 2 F3 Bevel Beam of Top Roof 4 F5 Middle Beam of Top Roof 2 G1 Bevel Beam of Big Roof 4 H1 Middle Beam of Big Roof 8 I Connector for Bevel Beam 4 J Connector for Middle Beam 8 J1 Connector for Beam 6 J2 Connector for Beam 6 2
Part List Label Description Sketch QTY K5 Left Beam of Short Side 2 K6 Right Beam of Short Side 2 K7 Left Beam of Long Side 2 K8 Right Beam of Long Side 2 K9 Middle Beam of Long Side 2 L12 Upper Short Beam of Big Roof Short Side 4 L13 Middle Short Beam of Big Roof Short Side 4 L14 Upper Short Beam of Big Roof Long Side 4 L15 Lower Short Beam of Big Roof Long Side 4 L20 Middle Beam of Big Roof Long Side L23 Lower Short Beam of Big Roof Short Side 4 L25 Lower Short Beam of
Part List Label Description LD Lower Short Beam of Top Roof Short Side 2 M6 Short Tube for Mosquito Netting 4 M8 Long Tube for Mosquito Netting 4 Hook 1 PA Upper Metal Panel of Top Roof Long Side 2 PB Upper Metal Panel of Top Roof Short Side 2 PC Lower Metal Panel of Top Roof Long Side 2 PD Lower Metal Panel of Top Roof Short Side 2 Q6 Upper Left Metal Panel of Big Roof Short Side 2 Q7 Upper Right Metal Panel of Big Roof Short Side 2 Q8 Middle Left Metal Panel of Big Roof Sho
Part List Label Description Sketch Q13 Upper Right Metal Panel of Big Roof Long Side 2 Q14 Middle Left Metal Panel of Big Roof Long Side 2 Q15 Middle Right Metal Panel of Big Roof Long Side 2 Q16 Lower Left Metal Pane of Big Roof Long Side 2 Q17 Lower Right Metal Panel of Big Roof Long Side 2 R1 Bevel Beam Cover Plate of Big Roof 4 R2 Middle Beam of Big Roof 4 R7-2 Middle Cover Plate of Top Roof 1 R8-2 Bevel Beam Cover Plate of Top Roof 4 T Curved Supporting Tube 8 U-1 Mosq
Hardware List BB Washer M6 52 DD Hex Nut M6 52 FF Cross Outer Hexagon Bolt M6 x 20 254 GG Cross Outer Hexagon Bolt M6 x 15 22 HH Q Ring 120 JJ Cross Outer Hexagon Bolt M6 x 55 28 KK Cross Outer Hexagon Bolt M6 x 90 24 LL Cross Outer Hexagon Bolt M6 x 60 2 PP Stake Ø8 x 180 8 QQ Cross Outer Hexagon Bolt M6 x 40 Z1 56 2 Wrench M6 0 1 2 3 4 6 5 6 7 8
Step 1 A FF 28X 4X B1 C1 I 4X 4X 4X M6x20 SETP2 SETP1 7 SETP3
Step 2 K5 2X J DD 20X FF 4X KK 20X 8X K6 2X K7 2X J1 M6 6X BB 20X M6x20 J2 K8 2X M6 6X M6x90 K9 2X SETP2 Attention : 1. Please make sure the screws holes are correponded with each other when join J2, J, J1 with K7, K8, K9. 2. Pay attention to the direction of J when assemble.
Step 3 M8 DD 4X FF 12X KK 4X M6 M6 4X BB 4X M6x20 M6 M6x90 SETP2 SETP1 SETP2 SETP1 9
Step 4 FF 12X 2X K5 QQ 16X K6 4X M6x20 A T 4X SETP2 SETP1 Rt=90º Use the framing square to ensure each Post remains at a 90 degree angle to the Short Beam and Long Beam. Secure each Arch Support to the Posts using 4pcs Screw (QQ) at each location.
Step 5 FF 12X 2X K8 K7 K9 M6x20 Attention: This step requires at least 5 people.
Step 6 T QQ 16X 4X 147.7 in 2.9 in 124.0 in 19 19 2.9 in Site Dimensions Rt=90º Use the framing square to ensure each Post remains at a 90 degree angle to the Short Beam and Long Beam. Secure each Arch Support to the Posts using 4pcs Screw (QQ) at each location.
Step 7 GG 16X E7 2X M6x15 E8 2X E6 4X SETP1 SETP2 13
Step 8 G1 DD 8X FF 8X JJ 8X 4X M6 BB 8X M6x20 M6 SETP1 SETP2 14 M6x55
Step 9 H1 DD 16X FF 16X JJ 16X 8X M6 BB 16X M6x20 M6 SETP1 SETP2 15 M6x55
Step 10 D1 DD 4X FF 2X GG 6X JJ 4X 1X F3 M6 4X BB 4X M6x15 M6x20 F5 M6x55 M6 2X SETP2 SETP4 SETP1 SETP3 16
Step 11 LA 4X FF 24X LB 2X LC 4X M6x20 LD 2X SETP2 SETP1 17
Step 12 PA FF 8X 2X PB 2X M6x20 18
Step 13 PC FF 8X 2X PD 2X M6x20 SETP1 SETP2 Attention : Please don’t collide the panels to avoid damage.
Step 14 R7-2 QQ 8X LL 2X 1X R8-2 4X M6x40 P M6x60 1X SETP2 SETP1 SETP3 20
Step 15 L12 4X L20 12X L13 4X L23 4X L14 4X L25 4X FF 72X M6x20 L15 4X SETP1 SETP2 21
Step 16 Q6 Q12 2X 2X Q7 Q13 2X 2X FF 16X M6x20 SETP2 SETP1 Attention : Please don’t collide the panels to avoid damage.
Step 17 Q8 Q14 2X 2X Q9 Q15 2X 2X FF 16X M6x20 SETP2 SETP1 SETP3 Attention : Please don’t collide the panels to avoid damage.
Step 18 Q10 Q16 2X 2X Q11 Q17 2X 2X BB 16X FF 16X M6 M6x20 SETP2 SETP1 SETP3 Attention : Please don’t collide the panels to avoid damage.
Step 19 R1 QQ 8X 4X M6x40 SETP1 25 SETP2
Step 20 R2 QQ 8X 4X M6x40 26
Step 21 U-1 HH 60X 1X 7 pcs 8 pcs SETP1 SETP2 SETP3 SETP4 27
Step 22 V-1 HH 60X 1X 7 pcs 8 pcs SETP1 SETP2 SETP3 28
Step 23 PP 8X Φ8x180 Tips: Please purchase the anchors from local hardware store if anchor the gazebo to concrete or wood.