Use And Care Manual

Operator’s Manual
Chipper Shredders
11
Check for parts online at www.getearthquake.com or call 800-345-6007 M-F 8-5
Install the Handle (SEE FIGURE 7)
1. Hold the hopper handle (A) up so that the outer holes in the
handle align with the holes in the hopper and secure with
four M8-1.25 x 20 bolts (B), M8 washers (C) and M8-1.25 nuts
(D). Insert the screws from the outside of the hopper.
Install the Hopper Guard (SEE FIGURE 6)
1. Hold the hopper guard assembly (A) so that the rubber
guard is directed down towards the bottom of the hopper.
Align the assembly holes with the holes in the hopper.
2. Using the three M6-1.0 x 16 bolts (B), M6 springlock
washers (C) and M6-1.0 nuts (D), secure the guard
assembly (A) to the hopper. Insert the bolts with washers
from the outside of the shredder hopper.
D
A
C
B
FIGURE 6
B
D
C
FIGURE 7
A
A
B
C
D
Install Debris Bag
1. Slide the support rod (A) into the bracket (B). SEE
FIGURE 8. Rotate the rod so that it sits below the front
tab (C) of the bracket. FIGURE 9
2. Slide the tabs (D) on the debris bag onto the support rod.
FIGURE 10
3. Secure the bag connector (E) onto the chipper by
rotating the connector until locked in. SEE FIGURE 10
FIGURE 8
FIGURE 9
E
FIGURE 10