Operator's Manual Original Operating Instructions Two-Man Earth Auger Powerhead 9800 Series Includes models: 9800B 9800H 9800BCE (European) Get parts online at www.getearthquake.
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series INTRODUCTION Congratulations on your investment in quality. Thank you for purchasing an Earthquake Two-Man Auger Powerhead. We have worked to ensure that this powerhead meets the highest standards for usability and durability. With proper care, this powerhead will provide many years of service. Please read this entire manual before installation and use.
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series Warnings and Safety Precautions Operator's RESPONSIBILITY Accurate assembly and safe and effective use of the machine is the operator's responsibility. • Read and follow all safety instructions. • Carefully follow all assembly instructions. • Maintain the machine according to directions and schedule included in this operator’s manual. • Ensure that anyone who uses the machine is familiar with all controls and safety precautions.
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series General Safety Rules • • • • • • • • • • • • • • • • • 4 Read, understand, and follow all instructions on the machine and in the manual(s). Be thoroughly familiar with the controls and the proper use of the machine before starting. Use this equipment for its intended purpose only. Familiarize yourself with all of the safety and operating decals on this equipment and on any of its attachments or accessories.
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series Engine Safety Precautions Warning Warning Carbon Monoxide Poisoning Engines give off carbon monoxide, an odorless, colorless, poison gas. Carbon monoxide may be present even if you do not smell or see any engine exhaust. Breathing carbon monoxide can cause nausea, fainting or death, in addition to drowsiness, dizziness and confusion. Engines give off carbon monoxide, an odorless, colorless, poison gas.
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series • • • • • • • Do not store engine with fuel in fuel tank indoors. Fuel and fuel vapors are highly explosive. During storage, screw down gas cap vent screw tightly if equipped. Never pour fuel from engine fuel tank. Never siphon fuel by mouth to drain fuel tank. Always have an adult fill the fuel tank and never allow children to fill the engine. Never allow an adult or anyone under the influence of drugs or alcohol to fill engine.
sam 01 Operator's Manual Two-Man Earth Auger Powerhead 9800 Series SAFETY DECALS (9800BCE European models only) This auger unit has been designed and manufactured to provide you with the safety and reliability you would expect from an industry leader in outdoor power equipment manufacturing.
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series ASSEMBLY UNPACK Powerhead 1. Carefully lift the powerhead out of the box, remove any packing material and cut any ties. Tools Required • Two (2) 9/16” Wrenches Assembly Instructions (SEE FIGURE 1) 1. Insert the output shaft of the transmission in the open end of the Flex Coil Shock Top. 2. Line up the bolt holes through the Flex Coil Shock Top and the output shaft of the transmission. 3. Place the included 3/8-16 x 1.
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series OPERATION PRE-START CHECKLIST 1. Read and understand the operator's manual that came with your unit and the engine. 2. Fill oil sump or check oil level. Check oil level often during engine break-in. 3. Fill fuel tank. Use unleaded, regular gasoline. 4. Be sure spark plug wire is attached to spark plug. PREPARING ENGINE FOR STARTING To check the oil 1. Check the engine oil level with the engine stopped and in a level position. 2.
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series Filling Fuel Tank 1. Shut-off engine and allow engine to completely cool before refilling the gas tank. 2. Move to a well-ventilated area, outdoors, away from flames and sparks. 3. Clean debris from area around the gas cap. 4. Loosen gas cap slowly. Place the cap on a clean, dry surface. 5. Carefully add fuel without spilling. 6. Do not fill gas tank completely full; allow space for fuel to expand. 7. Immediately replace gas cap and tighten.
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series MAINTENANCE AND STORAGE Power AUGER MAINTENANCE 1. The gear case has 4 oz. of grease installed at the factory. It is recommended that once a year the gear case be split and the grease level checked. Add grease only if level of grease is below top of the gears. DO NOT OVERFILL. 2. Keep all screws, nuts, and bolts tight. 3. For cold weather operation, store the unit in a cool environment.
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series LONG-TERM STORAGE If your earth auger will not be used for more than one month, prepare it for long-term storage. Follow the steps below to prepare your earth auger unit for storage. Read your engine manual for detailed instructions on preparing the engine for storage. 1. Run with gas stabilizer in fuel. The screen in the carburetor will glaze shut if gas stabilizer is not used before storage. 2. Drain the fuel system.
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series Troubleshooting Guide CAUTION Practice safety at all times. Engine must be turned off and allowed to cool, and spark plug wire must be disconnected before attempting any maintenance or repair. PROBLEM POSSIBLE CAUSE REMEDY/ACTION Engine will not start 1. Power switch off 1. Flip switch to on position 2. Spark plug wire disconnected 2. Connect spark plug wire to spark plug 3. Fuel valve closed 3. Open fuel valve 1. Dirty air cleaner 1.
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series Parts Breakdown 9800B/9800BCE/9800H 1 6 7 8 5 9 2 12 13 3 11 11 10 11 4 KEY NO. 1 14 PART NO. DESCRIPTION QTY. KEY NO. PART NO. DESCRIPTION QTY.
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series 9800B/9800BCE/9800H Transmission parts explosion KEY NO. 16 13 4 8 5 6 12 11 2 9 7 4 5 3 1 15 4 PART NO. DESCRIPTION QTY. 1 75600* KIT LOWER CASTING 1 2 8915 DOWEL PIN STEEL 1/4 INCH X 1/2 INCH 2 3 8919 GASKET-POWERHEAD TRANSMISSION 1 4 8922 BEARING BALL R12 DOUBLE LIP SEALED 3/4 IN. I.D. 3 5 8923 BEARING BALL R10 OPEN 5/8 IN. I.D.
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series Auger parts explosions EA2F, EA3F EA4F EA6F 27 27 20 2 4 3 21 10 8, 9 1 7 22 11 18 19 14 18 5 6 15 19 5 EA8F EA10F EA12F, EA14F BALLOON # 2 2 20 4 1 7 3 20 21 2 4 1 1 21 7 22 21 PART # DESCRIPTION QTY 1 154 EARTH AUGER WELDMENT 10 IN RH 1 2 8980 SHOCK SPRING 1 3 EB10A BLADE EARTH 10INCH CUT AND SHARPENED 1 4 EBOLT BOLT 1/4-28 X 5/8 HH GR5 ZN 2 5 1423 BOLT 5/16-18 X 2 HH GR5 ZN 2 6 WF516 WAS
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series Auger parts List KEY NO. PART NO. DESCRIPTION QTY.
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series 9800 Series EARTH AUGER POWERHEAD Warranty Terms and Conditions Product Warranty: 1-Year Limited Warranty Ardisam, Inc., a manufacturing company, warrants this Earthquake® EARTH AUGER POWERHEAD to be free from defects in the material or workmanship for a period of one year from the date of purchase.
Operator's Manual Two-Man Earth Auger Powerhead 9800 Series Check for parts online at www.getearthquake.
Earthquake®, Division of Ardisam, Inc. 1160 8th Avenue, PO Box 666 Cumberland, WI 54829 800-345-6007 | Fax 715-822-2223 E-mail: info@ardisam.com All weights, specifications and features are approximate and are subject to change without notice. Due to continuous product improvements, product images may not be exact. Items used for props not included. Some assembly may be required. Check for parts online at www.getearthquake.