- Eaton UPS User's Guide

INSTALLATION SETUP
Eaton 9170
+
UPS (3–18 kVA) User's Guide S 164201393 Rev E www.eaton.com/powerquality
14
4. Turn all four caster bolts counter-clockwise until the cabinet rests
on the floor. Place a plastic cap into each bolt access hole.
NOTE If the floor is uneven and the cabinet is tilted or unstable, you may need to place a
thin steel plate under a corner.
Do not use the caster bolts to level the cabinet.
Stabilizer Bracket
Figure 8. Stabilizer Bracket Installation
Rack-Mount Installation (Three- and Six-Slot Cabinets)
NOTE For 9- and 12-slot cabinets, follow the installation instructions with the 9- and
12-slot rack-mount kit.
NOTE The UPS cabinet is heavy (see page 105). This procedure requires two people to lift
and position the cabinet into the equipment rack. Install the cabinet in the rack before
installing power and battery modules and before making connections to the intended power
source.
The 3- and 6-slot UPS cabinets may be installed in an EIA-standard
48.3 cm (19) equipment rack. An optional rack-mounting kit (ASY-0547),
containing brackets and required hardware, is available.
For each 3-slot section, use the following mounting procedure to convert
the UPS cabinet and install it in the equipment rack:
1. Remove the four screws (two on either side) securing the top cover
of the UPS cabinet. Carefully lift the cover straight up and off to
avoid stressing the front panel display. Set the cover aside.
2. Remove the two cabinet side covers (four covers in 6-slot cabinets)
by lifting the top edge. No other hardware must be detached. Store
or discard the side covers.