Specifications

Installation Reference
A-52 Eaton PDU (150 kVA) Installation and Operation Manual 164202126—Rev 5 www.eaton.com/powerquality
Figure A-41. Power Terminal Locations – “F” Frame PDU Input Main Breaker CB1 or CB2 Terminal Detail
Figure A-42. Power Terminal Locations – “K” Frame PDU Input Main Breaker CB1 or CB2 Terminal Detail
Figure A-43. Power Terminal Locations – “L” Frame PDU Input Main Breaker CB1 or CB2 Terminal Detail
Phase A
Phase B
Phase C
AC Input to Main
Breaker CB1 or CB2
Phase A
Phase B
Phase C
AC Input to Main
Breaker CB1 or CB2
Phase A
Phase B
Phase C
AC Input to Main
Breaker CB1 or CB2
Figure A-41. Power Terminal Locations – “F” Frame
P
DU Input Main Breaker CB1
o
r CB2 Terminal Detail