Operating instructions

UPS Operating Instructions
6-22 Eaton 9E UPS (40–60 kVA, 208/220V) Generation 3 Installation and Operation Manual P-164000302—Rev 1 www.eaton.com/powerquality
6.4.10 Charger Control
To turn an individual UPS battery charger on:
1. S e l e c t th e CONTROLS symbol on the main menu bar on the UPS requiring the charger to be turned on.
The System Control screen is displayed.
2. Select Battery on the System Control screen.
3. On the Battery System Control screen, select the RESTING CHARGING command, then press the
RETURN pushbutton.
To turn an individual UPS battery charger off:
1. S e l e c t th e CONTROLS symbol on the main menu bar on the UPS requiring the charger to be turned off.
The System Control screen is displayed.
2. Select Battery on the System Control screen.
3. On the Battery System Control screen, select the CHARGING RESTING command, then press the
RETURN pushbutton.
6.4.11 Battery Test
To start an individual UPS battery test:
1. S e l e c t th e CONTROLS symbol on the main menu bar on the UPS to be tested. The System Control
screen is displayed.
2. Select Battery on the System Control screen.
3. On the Battery System Control screen, select the RESTING TESTING command, then press the
RETURN pushbutton.
6.4.12 Using the UPS LOAD OFF Command
A UPS Load Off is initiated by the Load Off command on the UPS Control screen. The UPS LOAD OFF controls
the UPSs output by powering down the UPS and de-energizing the critical load.
The UPSs (including Bypass) remains off until restarted.
To use the LOAD OFF command:
1. S e l e c t th e CONTROLS symbol on the main menu bar on the UPS to be shut down. The System Control
screen is displayed.
2. Select UPS on the System Control screen.
3. On the UPS System Control screen, select the NORMAL LOAD OFF or BYPASS LOAD OFF
command depending on the UPS mode, then press the RETURN pushbutton.
The Verify Action screen is displayed, providing a choice to proceed or abort the shutdown.
NOTE 1 This UPS has a user initiated battery test intended to determine if the
batteries are able to support the load.
NOTE 2 The battery test is only able to be initiated when the battery is fully
charged. This normally occurs within 72 hours of the start of a charging
cycle. The command will not be shown if the test is not able to be run.