User Manual

Page 31
5-6kVA EU_EN
ENGLISH
Installation of the communication cards
Parallel communication port.
This slot is used for Parallel operation (only on 9PX models).
It is not necessary to shutdown
the UPS before installing
a communication card.
1. Remove the slot cover
4
secured by screws.
2. Insert the communication
card in the slot.
3. Secure the card cover with
the 2 screws.
6.2 Eaton Intelligent Power Software suite
Eaton Software suite provides up-to-date graphics of UPS power and system data and power ow.
It also gives you a complete record of critical power events, and it noties you of important UPS or power
information.
If there is a power outage and the 9SX and 9PX UPS battery power becomes low, Eaton Software suite can
automatically shut down your computer system to protect your data before the UPS shutdown occurs.
6. Communication