Installation Manual

I.L. 17568
Effective January, 2000
Page 3
OPERATION CHECK
Verify that the NEU terminal is used. In three-wire
applications or applications with PT’s, the NEU terminal
must be tied to ground. Otherwise, wire NEU to the
power system’s neutral.
Apply ac line power to the meter. The front display of
meter should become operational within 2 seconds at
480 Vac or within 8 seconds at 120 Vac. If the device is
not powered, remove power and check the wiring
diagrams and device connections.
Restore ac line power to the meter and check readings
on the unit. If the readings do not check out, or an alarm
condition occurs, consult the instruction manual or call
Eaton Customer Support.
MAINTENANCE
This industrial type control is designed to be installed,
operated, and maintained by adequately trained
personnel. These instructions do not cover all details,
variations, or combinations of the equipment, its storage,
delivery, installation, checkout, safe operation, or
maintenance. Care must be exercised to comply with
local, state, and national regulations, as well as safety
practices, for this class of equipment.
There are no user serviceable parts on the Separate
Source Power Module. While there is a 0.25A fuse
within the module, its failure would indicate other
problems that require repair. The user should not
attempt servicing this equipment. Please contact your
local Eaton representative or
Eaton Customer Support.