Cut Sheet

Volume 7—Logic Control, Operator Interface and Connectivity Solutions CA08100008E—March 2014 www.eaton.com V7-T2-43
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2.2
Stacklights
E26 Series
Mounting Instructions
Stacklight bases may be
mounted without the use of
an extension tube or
mounting base. If additional
height is required, choose
0.8–30 in (20–760 mm)
extension tubes that fit
between the mounting base
and stacklight base. The
extension tubes are threaded
with 3/4 in NPT threads,
allowing for direct connection
to conduit fittings or threaded
holes without the use of a
mounting base.
Base Mounting
Utilizing Extension Tube
and Mounting Base
Utilizing Extension Tube
and 3/4 In (19.1 mm)
Conduit Hub
Mounting Dimensions
Approximate Dimensions in Inches (mm)
Base Mounting
Three-Hole Mounting for
E26S108
Four-Hole Mounting for
E26S109
Conduit Hub for E26S104—
3/4 In (19.1 mm)
Note
1
Stacklight base and gasket are supplied as standard with two sets of base mount holes.
One set with center-to-center spacing of 1.75 in (44.5 mm) and another set with center-to-center spacing of 1.65 in (42 mm).
Stacklight
Base
Customer
Supplied
Customer
Supplied
Mounting
Gasket
Panel
Set Screw
Recommended
Tightening Torque
Is 7 in-lb
(0.79 Nm)
Mounting
Base
Mounting
Gasket
Panel
Stacklight
Base
Extension
Tube
O-Rings
Extension
Tube
O-Rings
Myers Type
ST-2 or
ST-2CP Hub
Panel
Stacklight
Base
(Use Rubber-Jawed Pliers for
Installation to Avoid Scratching
the Black Anodized Coating)
Set Screw
Recommended
Tightening Torque
Is 7 in-lb
(0.79 Nm)
1.75 (44.5)
or 1.65 (42.0)
a
0.18 (4.6) Dia.
or #8–32 Thread
or (M4 x 0.7)
0.87
(22.1)
Dia.
120°
0.87
(22.1)
Dia.
1.92 (48.8)
Dia.
0.18 (4.6) Dia.
or #8–32 Thread
or (M4 x 0.7)
90°
0.87
(22.1)
Dia.
2.12 (53.8)
Dia.
0.20 (5.08) Dia.
or #10–32 Thread
or (M5 x 0.7)
1.06
(27)
Dia.