User`s guide

INSTALLATION
EATON Powerware
®
9125 Two-in-One PDM (5000/6000 VA) User’s Guide S 164201519 Rev D
www.powerware.com
17
3. If installing additional cabinets, repeat Step 2 for each cabinet.
Joining Bracket PDM
UPS
Joining Bracket
Figure 5. Installing the Joining Brackets (Top View)
4. If you are installing an optional EBM, continue to the following
section, “EBM Installation;” otherwise, continue to
“Plug-Receptacle PDM Installation” on page 19 or “Hardwired
PDM Installation” on page 25.