Drawing : - TPC229
Issue : - 2
Date : - 10/12/13
CONSTRUCTION OF CHAMBER
Floor:
An insulated concrete floor is recommended.
Start with a gravel base.
Lay down 2” of rigid Styrofoam.
Pour 4” of reinforced concrete.
Seal concrete with any commercially prepared sealer
Notes: A slightly pitched floor leading to drain may be incorporated.
This will helpful if large amounts of softwood are to e dried.
Should an insulated concrete floor not be feasible, a well-built,
insulated wooden floor will work.
See Figure 3.
Wall/Ceiling Construction:
Make a 2” x 4” studded frame.
Cover exterior with ½” exterior grade plywood or waferboard.
Insulate to proper R-Value.
Staple or tack 4mm. Plastic over insulation prior to installing inside the
wall. This vapor barrier protects insulation from moisture.
Spray paint over staples to prevent corrosion.
Hand ¼” exterior grade plywood as inside wall.
Coat the inside wall and ceilings with a vapor barrier grade sealer.
This protects the inside walls and ceiling from moisture and insures
long life for your kiln. (Aluminized mobile home roofing paint works
well).
Use a silicone caulk to seal up all cracks and seams.
See Figures 4 and 5.