Owner`s manual

Page 18 of 40
Drawing : - TPC229
Issue : - 2
Date : - 10/12/13
INSTALLATION AND TESTING
Installation
All wiring should be carried out by a competent electrical contractor in
accordance with local regulations.
The 16-inch circulation fans do not connect to the STC1 Controller. They
must be connected to separate switchgear.
Check the voltage at the power supply to insure correct voltage is 220 Volt +/-
10%, 1 Phase, 60 Hz.
The LD3000 must be plugged into a suitable fused 220 Volt outlet.
Using the mounting brackets provided with the unit, mount the LD3000 4” 8”
from the ceiling, centered on the back wall.
Attach the discharge hose to the drainage nipple.
Locate and drill three (3) holes fro the following:
Discharge hose – ensure that the water discharge will gravity feed from
the kiln chamber.
Power cord and Controller cord Ensure that the power cord reaches
the 220 Volt, 1 Phase, 60 Hz outlet and that the controller cord reaches
the plug connection on the STC1 Controller.
Use silicone rubber caulking or a similar material to seal the holes after proper
installation of the discharge hose, power cord, and controller cord. This will
aid in preventing heat loss from the kiln.
Warning:
OSHA complying guards are strongly recommended
when fans are installed with 7’ of floor, working level,
or within reach of personnel. Review OSHA codes.