Install Manual
VERSION: v2.9REVISION DATE: 06/28/22
INSTALLATION GUIDE
PLACEMENT
PAGE
08
STRUCTURAL ATTACHMENT
POINTS
• Find the required structural attachment
points.
SPACING
• Spacing may vary depending upon project
specic structural requirements: i.e. high
snow and wind load areas may require
lesser bracket spacing in the E-W axis vs.
the maximum spacing.
• Max spacing is 48" OC for portrait
orientation and 72" OC for landscape
orientation.
• Consult project layout diagram for project
specic bracket spacing on the roof.
• Install RockIt mounts to predetermined
mount spacing.
ARRAY SKIRT SECTIONS
• The RockIt array skirt sections are the width
of a typical 60 cell module.
• Use the RockIt array skirt as a guide to lay
out module placement.
THE DISTANCE
• The distance between the rows of mounts
is calculated by the module dimension N-S
plus 1 5/16".
• Lag screw should be installed as close to
center of exposed shingle as possible.
MODULE SPACING
N
S
Max 48’
Max 72’
Array SkirtArray Skirt
Distance Between Rows = Y + 1 5/16" Distance Between Rows = X + 1 5/16"
S S
N
N
X
Y