User Manual

Patient Safeguard System® Patient Bed Installation
UltraClenz, LLC
Page 23
1.5 Step 5: Installing the Bed Beacon on the Bed
The Bed Beacon is mounted under the bed and mounts directly to the left frame as shown (see Figure 6).
Tape mounting
Mount the Bed Beacon under the bed on the left rail metal surface with double-sided tape (supplied) and secure
with the 18” long cable tie (see Figure 6). Make sure both the Bed Beacon and the mounting surface are clean and
free of dirt and oil. A soft cloth dampened with isopropyl alcohol works well to clean both surfaces.
2. Cable Management
2.1 ALP Sensor, Bed Beacon, Bed Antenna and Dock Cable Routing
1. Place cable tie holders, cable ties and route cable to the Dock as shown (see Figure7, 8 & 9). Make sure the
mounting surface is clean and free of dirt and oil. A soft cloth dampened with isopropyl alcohol works well to clean
mounting surfaces.
Figure 6. Installing the Bed Beacon on a Patient Bed
Head of the bed
Foot of the bed
Figure 7. ALPS Cable Routing and Cable Tie Holder Placement
Cable Tie (18”)
Service Loop (17”)